Laserfiche WebLink
1 3. Identification and application of techniques to minimize the perceived bulk of the <br />2 proposed structure, such as: <br />3 (i) Placing the long axis of the building perpendicular to the river; <br />4 (ii) Stepping back of portions of the facade; <br />5 (iii) Lowering the roof pitch or use of a flat roof; <br />6 (iv) Using building materials or mitigation techniques that will blend in with the <br />7 natural surroundings such as green roofs, green walls, or other green and <br />8 brown building materials; <br />9 (v) Narrowing the profile of upper floors of the building; <br />10 (vi) Increasing the setbacks of the building from the Mississippi River or <br />11 blufflines; <br />12 (vii) Identification of techniques for preservation of those view corridors <br />13 identified in the MRCCA plan; and <br />14 (viii) Opportunities for creation or enhancement of public river corridor views. <br />15 (3) Structure and impervious surface placement. <br />16 a. Structures and impervious surface must not be placed in the shore or bluff impact zones <br />17 unless identified as an exemption in section 920(L). <br />18 b. Structures and facilities must comply with the following OHWL setback provisions <br />19 unless identified as exempt in section 920(L): <br />20 1. ROS District: 200 feet from the Mississippi River. <br />21 2. RN District: 100 feet from the Mississippi River and 75 feet from the Rum Rivcr. <br />22 c. Structures and facilities must comply with the following bluffline setback provisions <br />23 unless identified as exempt in section 920(L): <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />1. ROS District: 100 feet. <br />2. RN District: 40 feet. <br />3. SR District: 40 feet. <br />d. Where principal structures exist on the adjoining lots on both sides of a proposed <br />building site, the minimum setback may be altered to conform to the average of the <br />adjoining setbacks, provided that the new structure's scale and bulk riverward or <br />bluffward of the setbacks required under section 920(F)(3) consistent with adjoining <br />development. See Figure 6. <br />Figure 6. Structure Setback Averaging <br />Required <br />structure <br />setback <br />Structure Setback Averaging <br />Existing <br />principal <br />structure <br />OHWL <br />Proposed , Existing <br />t... principal . principal <br />structure s. structure <br />X+Ys2 Y <br />Shore <br />No structures inthe "BIZ Impact <br />.....,. .: ' Zone (Sly) <br />Average <br />structure <br />setback <br />The scale and bulk of a proposed principal structure <br />must be consistent with existing principal structures. <br />32 <br />33 e. Subsurface sewage treatment systems, including the septic tank and absorption area, <br />34 must be located at least 75 feet from the ordinary high water level of the Mississippi <br />35 River and all other public waters. <br />36 (4) Lot size and buildable area. <br />Page 106 of 160 <br />