My WebLink
|
Help
|
About
|
Sign Out
Home
09/14/99
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
1990's
>
1999
>
09/14/99
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 4:25:14 PM
Creation date
5/28/2003 12:21:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
09/14/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FC CASE # ,.~ <br /> <br />Public Works Metal Building Improvements <br />By: Grant Riemer, Public Works Supervisor <br /> <br />Background: <br /> <br />In 1998, the Public Works Department made improvements to the interior lighting system <br />and replaced two of the overhead garage doors. The new garage doors are wider and <br />include automatic openers. We also removed an interior loading dock and changed the <br />location of a service door. All of these improvements have increased the utilization of <br />the building. <br /> <br />The City of Ramsey's Capital Improvement Program includes a project to improve the <br />metal building at the Public Works Facility. This project is to be funded over the next <br />three years, with $17,000 being allocated for 1999 <br /> <br />For 1999, we propose improvements in the following areas: <br />· Replace the remaining two overhead garage doors with wider doors and electric <br /> openers <br />· Install electrical outlets throughout the building <br />· Install overhead lighting in the remaining portion of the building <br />· Replace existing fuel tank and pump (this tank is used for off-road machinery only) <br />· Pour concrete aprons for the two remaining doors <br /> <br />We have solicited and received bids from the following companies: <br /> <br />Company Job Bid Cost <br />Industrial Door Garage Door Replacement $5,717.00 <br />Company <br />City Wide Garage Door $5,701.00 <br />Garage Door Replacement <br />Automated Garage Door Replacement $6,927.00 <br />Garage Door <br />Sterling Electric Electrical Work $7,723.00 <br />Arnie Billmark Electrical Work $9,350.00 <br />Electric ~ <br />Westside Fuel Tank Replacement $3,617.00 <br />Equipment <br />Determan Fuel Tank Replacement $2,540.00 <br />Brownie Inc. <br /> <br />The bids highlighted in the table are from the contractors that staff is recommending for <br />the project. We will pour the concrete aprons in-house. We estimate total cost for the <br />improvements to be $17,000.00. <br /> <br />G:~usersklThie~ing~C~UNC~L&~BUDGETF~999~September~PW~mpr~vements9~499FC.d~c 09/09/99 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.