Laserfiche WebLink
5. 19. <br />CC Regular Session <br />Meeting Date: <br />08/22/2023 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Information <br />Title <br />Adopt Resolution #23-198 Ordering Plans and Specifications for Halls Dover Acres Street Reconstructions, <br />Improvement Project #24-02 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23-198 ordering plans and specifications for Halls Dover Acres <br />Street Reconstructions, Improvement Project #24-02. <br />Background: <br />The 2023 — 2032 Capital Improvement Program (CIP) identifies the streets within the Halls Dover Acres <br />subdivision for street reconstruction in 2024. A street segment summary for the project is attached to this case. <br />Project History <br />On June 13, 2023, the Ramsey City Council adopted Resolution #23-130, accepting and awarding a proposal to <br />Bolton & Menk, Inc. for topographic survey of the project area. <br />On June 27, 2023, the Ramsey City Council adopted Resolution #23-129, accepting and awarding a proposal to <br />Chosen Valley Testing, Inc. for a geotechnical report of the project area. <br />Project Scope <br />This project proposes reconstruction of the streets within the Halls Dover Acres subdivision, which is generally <br />located between 157th Lane and 158th Lane, east of Nowthen Boulevard (CSAH 5). The streets are 24 feet wide <br />rural section totaling 0.98 miles in length. Traffic counts have not been taken, but Staff anticipates typical <br />neighborhood traffic levels due to the location of the subdivision. 157h Lane may have higher than typical traffic <br />due to the daycare center located at the intersection of 157h Lane and Nowthen Boulevard, but not rising to the <br />level of a collector street. <br />Sewer and water exist in the subdivision to the east, but this subdivision is not located within MUSA, and not <br />identified to receive sewer and water services. The 2040 Comprehensive Plan proposed water system <br />improvements does include extending 12-inch trunk watermain along 157th Lane from Potassium Street to <br />Nowthen Boulevard as part of a trunk system loop. This trunk watermain extension is proposed to occur as part of <br />this project. <br />The existing drainage is through swales adjacent to the roadway and street crossing culverts. The project proposes <br />to replace the existing street crossing culverts and will review the drainage swales to determine if improvements <br />to the drainage is necessary. <br />The project is not anticipating to require sub -soil corrections and the reconstruction is proposed to follow the <br />full -depth reclamation (FDR) design process. The existing alignment and profile of the streets are proposed to <br />generally be put back to existing. <br />Project Timelines <br />