My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/22/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 08/22/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:24:55 AM
Creation date
8/18/2023 12:01:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/22/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hakanson <br />lip Anderson <br />SECTION 3 <br />PROJECT APPROACH <br />DEVELOPMENT OF DETAILED PLANS <br />Our 45 years of experience focusing on municipal engineering gives us the project understanding needed to prepare <br />the detailed plans and specifications necessary for a successful project. Our proposal includes a topographic survey of <br />the existing streets, utilities, and other features scheduled for replacement. Our detailed plans will specifically show all <br />removals, milling, maintenance work, and any other proposed work and will eliminate any confusion by the Contractor, <br />allowing them to submit a confident and competitive bid. <br />DETAILED TRAFFIC CONTROL AND STAGING PLANS <br />In order for this project to be successful a significant amount of effort and thought must be put into preparing traffic <br />control and staging plans. If the traffic control and staging plans are not adequate and the Contractor is allowed to "open <br />up" all project areas at one time, there will likely be many unhappy residents and business owners. Staging plans that <br />require a Contractor to finish one project area within a certain timeframe before opening up a new project area will be <br />absolutely necessary. <br />HIGHLY SKILLED AND ORGANIZED TEAM <br />The City of Ramsey needs a consultant that is highly organized, has an established and streamlined Quality Program, is <br />skilled in the area of design, and has sufficient in-house staff to complete the required work within the time frame so <br />the goal of fully executed plans and specifications can be realized for construction in 2024. The engineers dedicated to <br />this project have successfully completed many similar projects. <br />PROJECT APPROACH 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.