My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/22/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 08/22/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:24:55 AM
Creation date
8/18/2023 12:01:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/22/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hakanson <br />lip Anderson <br />SECTION 3 <br />PROJECT APPROACH <br />Task 8 — Prepare Final Documents <br />Prepare final drawings, estimated quantities, specifications, conditions of the contract and bidding requirements. <br />Coordinate these plans and specifications with the permitting agencies. <br />Task 9 — Final Construction Cost Estimate <br />Finalize the estimated cost of construction and value engineer as required to maintain budget. <br />Task 10 — Quality Control Review <br />Schedule and conduct an in-house quality control review of the final draft of the construction documents. <br />Task 1 1 — Pre -bid Conference <br />Coordinate and attend pre -bid conference if the City requests one. <br />Task 12 - Bidding Process <br />Respond to Contractor questions, review and approve proposed Contractor substitutions in coordination with the City. <br />Prepare and coordinate any necessary Addenda. <br />Task 13 — Bid Opening <br />We will attend and assist the City in conducting the bid opening. After the bid opening, we will prepare a bid tabulation to <br />verify that the bid amounts agree with the estimated quantities and unit prices. If the City prefers, we can also conduct <br />the bid opening electronically through QuestCDN. <br />Deliverables: Final construction drawings and specifications, and final construction cost estimate. Draft addenda if <br />necessary. Prepare bid tabulation and award recommendation letter. <br />— CONSTRUCTION SERVICES <br />Upon request of the City, Hakanson Anderson will provide the following Construction Services as an Additional Service. <br />Task 1 — Pre -Construction Conference <br />Coordinate and attend preconstruction conference. <br />Task 2 - Construction Administration <br />The Project Manager and/or Design Engineers will be available during construction as needed to respond to questions and <br />to assist City Staff in interpreting the construction documents. <br />PROJECT APPROACH 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.