recommends the Public Works Committee recommend to City Council that Change Order No. 1 <br />with LaTour Constructim~ be approved in the amount of $14,184 and extending the contract <br />completion dais by 20 days. <br /> <br />Modon by Councihnember Pearson, seconded by Councihnember Olson, to recommend to City <br />Council that Chanoe Order No. 1 with LaTour Construction be approved in the amount of <br />$14,184 and extending the contract completion date by 20 days. <br /> <br />Action: Ratify the recommendation of the Public Works Committee. <br /> <br />Case ~3 <br /> <br />Consider Change Order for Improvement Project 05-22 Ramsey Town <br />Center Phase 2 Segment 1 <br /> <br />Buckground: <br /> <br />This project includes the construction of Civic Center Drive betxveen Zeolite and Sapphire . <br />Streets. One element of this street inch]des a "bump out" in the street section to accommodate <br />tbs bus loading zone in front of the mmticipal parkhig structure. Concrete pavement is required <br />through the area that busses will be braking and accelerating to prevent rutting and shoving that <br />would be anticipated if bituminous pavement were utilized. The plans called for a 10 foot wide <br />concrete bus parking section on the south side of the street, but made an accommodation for only <br />a five foot segment on the north side. If constructed in this manner only the right side on tbs bus <br />wheels would be braking on concrete pavement. In order to rectify this deficiency two options <br />have been considered. <br /> <br />Option One would be to mill out the base course of bituminous pavement adjacent to the <br />concrete and place seven foot concrete section adjacent to the existing concrete curb. This <br />would provide a wide etlough width to provide an adequate section for stopping buses. <br />However, this section would result in having a concrete section protruding into an <br />otherwise bituminous pavement on the north side of the street for a distance of <br />approximately 180 feet. On the south side of the street the concrete for the bus stop is <br />located entirely south of the extension of the cm'b line leading into the bus stop "bump <br />out". Although functional, there are aesthetic concerns with this alternative. The <br />estimated cost for this option is $11,635.00. It is suggested that the concrete section be <br />tapered for a more streamlined appearance. <br />Option Two would be to place a full width concrete section through a 250 foot section of <br />Civic Center Drive, by removing 37 feet of the bituminous base course and replacing it <br />cntimly with a concrete section. The estimated cost for this option is $106,128.00. <br /> <br />Motion to recommend to City Council that a change order be authorized for Option One in the <br />amount ors 11,635.00. <br /> <br />Action: Ratify the recommendation of the Public Works Committee. <br /> <br />Case <br /> <br />Consider CI auge O 'der for improvement Project 05-23 Ebon}, Street Sewer <br />attd Water and Street Improvements <br /> <br />-269- <br /> <br /> <br />