Laserfiche WebLink
Peat Removat & Granutar Sorrow Ptacemant <br />800 Hitachi Excavator <br />D65PX Kumatsu Dozer <br /> <br />Subtotal <br />Equipment ,Labor & Material Markup @ 15% <br /> Total <br /> <br />Equipment Standby 4/7/06 thru 5/2/06 <br />800 Hitachi Excavator <br />D65PX Kumatsu Dozer <br />966 Loa0er Cat <br />Subtotal <br />Equipment ,Labor & Material Markup @ 15% <br /> Total <br /> <br /> Dewatering Ma/;~tenance4///06 through 5/2/06 <br />Labor <br />Equipment ,Labor & Ma[edal Markup @ 15% <br /> Total <br /> <br />Materials <br /> <br />New 72" Manl~ole Base Sections <br />Equipment ,Labor & blaterial Markup ~ 15% <br />Sales Tax @ 6.5% <br /> Total <br /> <br />Dewatering Inc. - Subcontractor Labor <br /> <br />Fuel & Labor 4/7/06 through 5/2106 <br /> <br />Test Drilling <br /> <br />Outside Labor Markup (~ 5% <br /> <br />Subtotal <br /> <br /> Total <br /> <br />Total Additional Labor, Equipment & Materials <br /> <br />9.O HR $ 280.OO <br />4.0 /qR $ 148.00 <br />8.0 HR $ 162.00 <br /> <br />40.0 HR $ 164.50 <br />40.0 HR $ 72.10 <br />40.0 HR $ 67.20 <br /> <br />52 HR $ 69.15 <br /> <br />5 EA $2,330.64 <br /> <br />I LS $2,786.32 <br /> <br />1 LS $1,416.00 <br /> <br />2,520.00 <br />592.00 <br />1,296.00 <br />4,408.00 <br />661.20 <br />5,069.20 <br /> <br />6,580.00 <br />2,884.00 <br />2,688.OO <br />12,152.00 <br />1,822.80 <br />13,974.80 <br /> <br />$ 3,595.80 <br />$ 539.37 <br />$ 4,135.t7 <br /> <br />$ 11,653.20 <br />$ 1,747.98 <br />$ 757.46 <br />$ 14,158.64 <br /> <br />$ 2,786.32 <br /> <br />$ 1,416.00 <br /> $ 4,202.32 <br /> $ 210.12 <br /> $ 4,412.44 <br /> <br />47,727.37 <br /> <br />Total Additions / Deductioas To Contract <br />Total Additional Labor, Equipment,& Materials <br />Grand Total of Chaage Order Cost <br /> <br />$ (33,546.03) <br />$ 47,727.37 <br />$ 14,181.34 <br /> <br />-306-- <br /> <br /> <br />