Laserfiche WebLink
Change Order No 1 <br />))ate: May 3, 2006 <br />Pruject: 05-23 Ebony Street Sesver Water and Street hnprovements <br />Owner: City of Ramsey <br />Contractor: W B Miller Inc. <br /> <br />Co react Moddicatmn . <br /> <br />Realign Pipe iJ~to CatchbasiJt No 4 <br />Description of Change: This project was bid with Catchbasin No 4 needing to be <br />reconstructed tln-ee feet to the west because of the rclocation of the cnrbline. This existing <br />catchbasin bad an additional lead connected into it fi'om a storm project that was <br />perlbnned by thc Snperbowt. This additional lead needed to be reconnected into the <br />relocated catchbasin. <br />Jnstification of Change: This work was needed to be done to have the storm sewer <br />fimction properly and provide an outlet For the storm water pending system of thc <br />Superbowl. Thc additional work was not anticipated at the time thc contract documents <br />were prepared. <br />Cost of Change: The cost of this additional work is 2 hfs el'crew time (O, $600 per In' or <br />$1,200. <br /> <br />Removal of Buried Structure <br />Description of Change: During the conrse o£excavating For thc installation of the water <br />quality treatment structnre on 137th Lane, a buried manhole structttre was discovered <br />behind the cm'b adjacent to an electrical transformer box. It was necessary to remove, <br />dispose, and sheet next to thc electrical box. <br />Justification of Change: This work resulted from a change in anticipated conditions <br />Cost of Change: The cost of this additional work is 2 tvs of crew time ~ $600 per hr or <br />$1,200. <br /> <br />Relayiug oJ' CBMU No 7 <br />I)escription of Change: The plan sheet had an error which reversed the inverts of the <br />southeast inlet and the west inlet. This ,,vas not discovered until the mmzh61c had been set <br />and several lengths of pipe had been layed in the field. As a result it was necessary to <br />reorder a eon'coted section o£manhote bmTel and relay pipe. <br />.fustification of Change: Thc error was in the plans and not the responsibility of the <br />contractor. <br />Cost of Change: The cost of this additional work is 4 hrs of crew time c~ $600 per hr or <br />$2,400. In addition the cost of'restocking the section of manhole bah'e! was $1,537 for a <br />total cost 0£$3,937. <br /> <br />-312- <br /> <br /> <br />