My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/23/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 05/23/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:03:24 PM
Creation date
5/19/2006 3:08:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/23/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/&,mope a~d ])L~y)age of 24 f~ch Uo~wre~e Pipe <br />I)c.scriptiol~ of Cha~lge: The project inspector directed the removal and disposal of 48 <br />fbet of 24 inch reinforced concrete pipe which crossed nm~h to south across ~37~ <br /> <br />Justification of' Change: This was ex]sting storm water pipe which is no longer required. <br />Removal was ordered to prevent matei4al from migrating into the pipe and possibly <br />causing settlement of the mad. <br />Cost of Change: The cost of this additional work has been requested as 48 feet of <br />removal and disposal at $10 per foot for a total cost of $480, <br /> <br /> C~'a~t~ Ne~[,zl Due lo ik[odificaNa~t of kFater O~tt(zlity Treatment Stvuctm'e <br />Description of Chattge: The single ttnit systetn itzstallcd w'as heavier than the bid unit <br />and required a crane rental for installation. <br />&~stificatio~ of Change: The pJans called for the installation ora water quality <br />(reatmea~ structure to be plaeed in 137th Avenue and specified three acceptable <br />nlamlfac~urcrs or eq ual for d~e water quality stn~cture, Because of dm congested nature of <br />dds intersccdoo with other existing under~ound utilities it became apparent that only a <br />single stmckirc type of water quality treatmen~ unit could be installed wkhout costly tight <br />sheeting or {nstal/adon satkty implications. The unit bid consisted ora ~o manhole <br />tma~meu~ system of which each component manhole could have been installed with ~be <br />contractor's equipment. <br />Cost of Change: The cost of the crane rental was a lump sum amount of $I,300. <br /> <br />Originat Contract Price: $247,795.05 <br />Previous Claange Orders: NA <br />Chan§e in Contract Price due this Change Order: $8,~'17.00 <br />Total Contract f'rice including this and previous change <br />Orders: <br /> <br />$255,9~2.05 <br /> <br />This document will become a supplement to the contract and all provisions will apply <br />hereto. <br /> <br />I~,ecolnBlcnded: <br /> <br />F. nghmer Date <br /> <br />/~cccpted: <br /> <br />COIIll'llc [or Date <br /> <br />-313- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.