Laserfiche WebLink
2.3. Contractor shall rough in mechanicals according to mechanical rough in drawing <br />provided by building manufacturer. Mechanicals shall be terminated at top of <br />foundation. Final mechanical connections shall be done by contractor including floor <br />drains. <br />2.4. Contractor will perform initial startup of building using O & M manual as a reference. <br />Contractor will also perform any troubleshooting during initial startup. <br />HUFFCUTT 4154 123rd St. Chippewa 1COM 729 1 715-723-7446 <br />HUF CUTT. <br />