Laserfiche WebLink
Haviland Fields Development <br />Finding of Facts and Record of Decision <br />Name <br />Comment <br />Response <br />should have at least some idea of what <br />required permit for this <br />permits are required for the project, such as <br />development. The permit <br />comprehensive plan amendment, and that <br />application must include a <br />information should have been included <br />site plan, a Certificate of <br />within the EAW. <br />Survey, a Residential Energy <br />4. Section 14.0 states that there will be minimal <br />Code Compliance <br />tree removal, however, the EAW indicates <br />Certificate, and a Sub - <br />that 7.37 acres of wooded forested acres will <br />Contractor List. The building <br />be removed constituting over half of the <br />permit shall be kept on the <br />trees on site. How is this minimal tree <br />site of work until the <br />removal? <br />completion of the project, <br />5. Section 18.b.ii indicates that the project will <br />and shall specify the name <br />develop a travel demand management plan <br />and address of the <br />to reduce use of single occupancy motor <br />applicant and the general <br />vehicles, and increase walking, bicycling, and <br />contractor. <br />transit as primary modes of travel to reduce <br />GHG emissions from mobile sources. How will <br />this be developed, given the limited transit in <br />the community and limited suitable weather <br />to bike and walk? The EAW itself states that <br />no transit facilities are within 1 mile of the <br />project, so is the project proposing to create <br />their own transit network and facilities? Say, <br />to link their project with the nearest <br />MetroTransit bus stop or train station via <br />their own private bus service? <br />6. Is the plan for the residential areas to utilize <br />the church parking lot? <br />7. CSAH 5 & Iodine St level of service starts at E <br />in the PM for existing year 2023 but then <br />goes to A in opening year no build and D in <br />opening year 2027/ The text does not <br />indicate any changes to this intersection, so if <br />the project isn't built how would the level of <br />service improve from E to A as the traffic <br />analysis suggests? <br />8. On page 7, the EAW states that based on the <br />"land surface temperate" at the project site <br />during a heatwave in 2016 the site is <br />susceptible to extreme heat. Won't removal <br />of 59.4% of the tree canopy and no additional <br />plantings contribute to the urban heat island <br />effect and/or make the site a less desirable <br />place to live? <br />9. There are lots of conflicting statements <br />throughout the EAW that indicate that <br />natural resources will be preserved, however <br />in reality the majority of natural resources are <br />going to be impacted and/or removed as part <br />of the project. <br />10. On page 9 the EAW indicates that a <br />"Residential New Townhouse Unit" as a type <br />of application. What is a "Residential New <br />Townhome Unit Application"? <br />13 <br />