My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/26/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 09/26/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:27:09 AM
Creation date
9/27/2023 11:59:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/26/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Funding Source: <br />The engineer's construction cost estimate for the base bid is $7,500,000. A 10% contingency was added to the <br />estimated unit prices to address any changes that may result during construction. <br />An alternate bid is proposed to include prevailing wages in case state grant funding is utilized. In talking to <br />contractors, this alternate bid will add an additional 5-10% to the unit prices. <br />Funding for this project is proposed to come from water enterprise funds, and potentially from state grant funding <br />if legislatively appropriated in the future. <br />For almost two decades, municipal water users have been contributing to a future water treatment plant, which <br />includes off -site trunk watermain improvements required to provide the plant with raw water, and to transport <br />treated (finished) water out to the distribution mains. <br />Recommendation: <br />Staff recommends approving alternative # 1 to make sure that the new Water Treatment Plant can be served by the <br />six municipal wells in The COR when the plant is ready to be commissioned in the Spring of 2025. <br />Action: <br />Adopt Resolution #23-237 approving plans and specifications and authorizing advertisements for bids for <br />Improvement Project #21-08, Water Treatment Plant Trunk Watermain Improvements. <br />Resolution 23-237 <br />Plan Title Sheet <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Brian Hagen 09/21 /2023 03 :52 PM <br />Form Started By: Bruce Westby Started On: 09/20/2023 12:47 PM <br />Final Approval Date: 09/21/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.