My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/17/2023 - Special
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2023
>
Agenda - Council Work Session - 10/17/2023 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:29:16 AM
Creation date
10/11/2023 3:45:05 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Title
Special
Document Date
10/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 10. Existing and proposed subsurface sewage treatment systems. <br /> 2 (7) Non conformities. <br /> 3 a. All legally established nonconformities as of the date of this chapter may continue <br /> 4 consistent with Minn. Stats. §462.357,Subd. 1e. <br /> 5 b. New structures erected in conformance with the setback averaging provisions of <br /> 6 section 920(F)(3)d are conforming structures. <br /> 7 C. Site alterations and expansion of site alterations that were legally made prior to the <br /> 8 effective date of this chapter are conforming. Site alterations include vegetation, <br /> 9 erosion control, storm water control measures, and other nonstructural site <br /> 10 improvements. <br /> 11 d. Legally nonconforming principal structures that do not meet the setback requirements <br /> 12 of section 920(F)(3) may be expanded laterally provided that: <br /> 13 1. The expansion does not extend into the shore or bluff impact zone or further into <br /> 14 the required setback than the building line of the existing principal structure(See <br /> 15 Figure 5); and <br /> 16 2. The expanded structure's scale and bulk is consistent with that of the original <br /> 17 structure and existing surrounding development. <br /> Figure 5.Expansion of Nonconforming Structure <br /> Expansion of Nonconforming Structure <br /> p <br /> �'_�`� -(_�t ��.: Expansion <br /> Expansionrr�4 nzEr �: a allowed <br /> not allowed <br /> ' <br /> . <br /> QHWL <br /> Structure <br /> 17, <br /> NO <br /> Set}JdCIC <br /> Shore Impact Zone :Y-W ,35 <br /> (50%of structurezr.= <br /> setback) g ;fi#, <br /> .... <br /> x..::u <br /> .,.s:..s <br /> OHWL <br /> River <br /> 18 <br /> 19 (8) Notifications. <br /> 20 a. Amendments to this section and to the MRCCA plan must be submitted to the <br /> 21 Commissioner as provided in Minnesota Rules, part 6106.0070, Subp. 3, Items B-I. <br /> 22 b. Notice of public hearings for discretionary actions, including conditional and interim use <br /> 23 permits, variances, appeals, rezonings, preliminary plats, final subdivision plats, master <br /> 24 plans, and PUDs, must be sent to the following entities at least 30 days prior to the <br /> 25 hearing: <br /> 26 1. The commissioner in a format prescribed by the DNR; <br /> 27 2. National Park Service; and <br /> 28 3. Where building heights exceed the height limits specified in section 920(F)(2) as <br /> 29 part of the conditional use or variance process, adjoining local governments within <br /> 30 the MRCCA,including those with overlapping jurisdiction and those across the river. <br /> 31 C. Notice of final decisions for actions in section 920(C)(7), including findings of fact, must <br /> 32 be sent to the Commissioner,the National Park Service, and adjoining local governments <br /> 33 within the MRCCA within ten days of the final decision. <br /> Page 102 of 160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.