My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/24/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 10/24/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:29:47 AM
Creation date
10/30/2023 2:09:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/24/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
826
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47 will see somewhat higher delay as the road has very high traffic during the peak hours and none of these <br /> turning movements operate with a high enough level of delay to be considered a concern. All intersections <br /> and movements are anticipated to operate within acceptable conditions and all 95t" percentile queues are <br /> anticipated to remain within their respective storage bays. <br /> While the main site access at Iodine Street/site access& CSAH 5 is anticipated to operate acceptably and <br /> currently provides turn lanes on CSAH 5. Anoka County has expressed a desire to eliminate the"trap lane" <br /> scenario. Currently the outside northwest bound lane on CSAH 5 becomes the right turn lane into the site <br /> access, forcing vehicles that are going straight to merge into the other through lane. It is recommended to <br /> explore options to restripe the northwest bound approach to have the merge occur before the intersection <br /> and have a dedicated northwest bound right turn lane into the site access. <br /> The SimTraffic reports are provided in Appendix D. <br /> HORIZON YEAR (2040) NO-BUILD CONDITIONS <br /> A capacity analysis was performed for Horizon Year(2040) No-Build conditions in order to develop baseline <br /> operating conditions for the design year. The two site accesses were modeled with the existing geometry <br /> and intersection control. The traffic volumes are provided in Exhibit 5. The results of the analysis are <br /> provided in Table 6. <br /> Haviland Fields-Ramsey, MN <br /> Traffic Impact Analysis I October 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.