My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/24/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 10/24/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:29:47 AM
Creation date
10/30/2023 2:09:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/24/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
826
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCLUSIONS AND RECOMMENDATIONS <br /> Presbyterian Homes is proposing a residential development consisting of 303 total Multifamily Housing <br /> Units, 173 units of Senior Adult Multifamily Housing building, and 22 Senior Single-family housing units. For <br /> a total of 498 housing units on site.The development is located on the block northwest of MN-47(St Francis <br /> Blvd) & CSAH 5 (Nowthen Blvd)which is the area around the Lord of Life Church. The church will remain <br /> on site. The site is anticipated to generate 153 new trips during the AM peak hour(40 entering, 113 exiting), <br /> 168 new trips during the PM peak hour (100 entering, 68 exiting), and 161 new trips in the Sunday peak <br /> hour(86 entering, 75 exiting). <br /> The site will include three (3) accesses. The northern access will be via Cobalt St to the north. This is a <br /> gated access only and will generally not serve a significant amount of site traffic. The second access is a <br /> right-in/right-out access located along CSAH 5 which leads to the north of the parking lot for the residential <br /> and church. The third (and primary)site access is across from Iodine St on CSAH 5,this access is expected <br /> to be the see nearly all of the site's traffic. The two accesses on CSAH 5 are in the same locations as the <br /> existing accesses and the Cobalt St access would be an extension of the current dead-end road. <br /> A capacity analysis was performed for Existing Year(2023), Opening Year(2027) No-Build, Opening Year <br /> (2027) Build, Horizon Year (2040) No-Build, and Horizon Year (2040) Build. In all scenarios, the study <br /> intersections are anticipated to operate at an acceptable LOS in the weekday AM and PM peak hours as <br /> well as the Sunday peak hours. Analysis showed that the build conditions have minimal impacts on the <br /> LOS at the study area intersections, with some movements seeing small increases in delay and LOS. It is <br /> anticipated that all intersections will operate at LOS D or better with the lone exception being the exiting <br /> movement of the site access (westbound left turns) operating at LOS E in the AM peak hour. Though not <br /> ideal, it is not anticipated to see any queueing issues or become a major issue in any way. Additionally, <br /> there are some longer delays (LOS E/F) for various other minor side street movements at intersections <br /> along CSAH 5, however there is minimal queuing and anticipated delays are not uncommon on a higher <br /> volume corridor like CSAH 5. <br /> No changes to the road geometry are necessary based on the operational analysis results with the addition <br /> of development traffic. Side-street stop control is adequate at the site accesses. However, based on <br /> conversations with Anoka County, the following improvements should be considered: <br /> • A northbound right turn lane at the north site access. <br /> • Reconfigure the northwest bound approach at the Iodine Street/site access&CSAH 5 to eliminate <br /> the trap lane and provide a dedicated northwest bound right turn lane. <br /> APPENDIX <br /> A. Exhibits <br /> B. Turning Movement Counts <br /> C. Site Layout Exhibit <br /> D. SimTraffic Analysis Results <br /> Haviland Fields-Ramsey, MN <br /> Traffic Impact Analysis I October 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.