Laserfiche WebLink
signal-controlled intersections might be necessary, especially regarding timing. The signal timings were <br /> optimized when the 2040 builds were run but the phasing and cycle length were unchanged. <br /> Some of the left-turn movements are anticipated to see an increase in delay due to the site traffic with a <br /> few operating at LOS E. No individual movement is anticipated to operate at LOS F and the movements <br /> that operate at LOS E generally saw only a modest increase in delay as a result of the added site traffic. <br /> The only intersection to operate at a LOS lower than D is the intersection of CSAH 5 & Iodine Street, <br /> specifically the westbound left turn movement which is primarily site traffic exiting the development. This <br /> level of delay is expected considering the high number of vehicles traveling southbound along CSAH 5 in <br /> the AM and is not of high enough concern to justify any major mitigation changes. Traffic patterns at this <br /> intersection should be observed in the future in case the traffic generated by the development is higher <br /> than estimated. <br /> The project could also exacerbate the aforementioned issue with the left turns at the MN-47 &Sunwood Dr <br /> intersection, since these movements show higher delays and in some cases LOS when compared to the <br /> 2040 No-Build Scenario. <br /> The SimTraffic reports are provided in Appendix D. <br /> TURN LANE WARRANT AT NORTH SITE ACCESS <br /> While the operations at the north site access are acceptable in all analysis scenarios, turn lane warrants <br /> were analyzed for the intersection in the build condition as the access is proposed to be converted from an <br /> exit only to right in/right out. The necessity of northbound right turn lane at CSAH 5 and the north site access <br /> was analyzed using NCHRP Report 457 - Evaluating Intersection Improvements: An Engineering Study <br /> Guide. CSAH 5 has a posted speed limit of 50 mph. <br /> The guidelines from NCHRP Report 457 recommend that if the plotted volumes are to the right of the curves <br /> for the speed of the major road listed, a right turn lane be considered. The PM Peak hour is the highest of <br /> the three peak hours in terms of volumes at the intersection. Table 8 summarizes the results from Figure <br /> 2-6 from NCHRP Report 457. A northbound right turn lane is not warranted in 2027 or 2040. <br /> Table 8- Right-Turn Lane Warrants <br /> Major Road Right Turn Limiting Right Turn <br /> Condition Volume Volume Right TurnWarranted <br /> (veh/h) (veh/h) VolumeYes/no? <br /> (veh/h) <br /> 2027—PM Peak Hour 442 5 28 No <br /> 2040—PM Peak Hour 496 5 25 No <br /> While a northbound right turn lane is not warranted, Anoka County has expressed a desire to have a <br /> northbound right turn lane installed at the access. <br /> Haviland Fields-Ramsey, MN <br /> Traffic Impact Analysis I October 2023 <br />