Laserfiche WebLink
fi. <br /> i` <br /> Haviland Fields EAW Comments: <br /> • In what ways will stormwater management facilities be designed to reduce the risks of <br /> flooding? <br /> • Currently the EAW shows that no trees will be planted,however, wouldn't the City of <br /> Ramsey require a certain number of trees to be replanted at a minimum? If so,how many <br /> trees would that be? <br /> The EAW indicates that a comprehensive plan amendment, as well as various other <br /> applications, would be applied for if needed. Isn't the applicant or the City of Ramsey <br /> aware of what applications are needed at this time? Since a site plan has already been <br /> submitted for review along with the application for business assistance it seems like the <br /> City of Ramsey and the applicant should have at least some idea of what permits are <br /> required for the project, such as a comprehensive plan amendment, and that information <br /> should have been included within the EAW. <br /> Section 14.C. states that there will be minimal tree removal,however, the EAW indicates <br /> that 7.37 acres of wooded/forested acres will be removed constituting over half of the <br /> trees on the site. How is this minimal tree removal? <br /> Section 18.b.ii indicates that the project will develop a travel demand management plan <br /> to reduce use of single occupancy motor vehicles, and increase walking,bicycling, and <br /> transit as primary modes of travel to reduce GHG emissions from mobile sources. How <br /> will this be developed, given the limited transit in the community and limited suitable <br /> weather to bike and walk?The EAW itself states that no transit facilities are within 1 mile <br /> of the project, so is the project proposing to create their own transit network and <br /> facilities? Say, to link their project with the nearest MetroTransit bus stop or train station <br /> via their own private bus service? <br /> ® Is the plan for the residential areas to utilize the church parking lot? <br /> p p g <br /> ® CSAH 5 & Iodine St level of service starts at E in the PM for existing year 2023 but then <br /> goes to A in opening year no build and D in opening year 2027. The text does not indicate <br /> any changes to this intersection, so if the project isn't built how would the level of service <br /> improve from E to A as the traffic analysis suggests? <br /> 0 On page 7, the EAW states that based on the"land surface temperate" at the project site <br /> duringa heatwave in 2016 the site is susceptible to extreme heat. Won't removal of <br /> p <br /> 59.4% of the tree canopy and no additional plantings contribute to the urban heat island <br /> effect and/or make the site a less desirable place to live? j <br /> ® There are lots of conflicting statements throughout the EAW that indicate that natural <br /> 3 <br /> resources will be preserved,however in reality the majority of natural resources are going <br /> to be impacted and/or removed as part of the project. <br /> ® On 9 the EAW indicates that a"Residential New Townhouse Unit" as a type of <br /> page Yp <br /> application. What is a"Residential New Townhome Unit Application"? <br />