My WebLink
|
Help
|
About
|
Sign Out
Home
Ordinance - #01-03 - 02/13/2001
Ramsey
>
Public
>
Ordinances
>
2001
>
Ordinance - #01-03 - 02/13/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:38:01 AM
Creation date
11/16/2023 11:56:51 AM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Ordinances
Resolution or Ordinance Number
#01-03
Document Date
02/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br /> <br />Quad Cities I-Net Performance Standards <br /> <br />Upon completion of the I-Net upgrade specified in Section 7 of the Franchise: <br /> <br />Video <br />A. <br /> <br /> Transmission <br /> Video transmission will comply with the following performance standards: <br />1° Carrier to noise ratio = 45dB or better <br />2. Carrier to composite triple beat = 53dB or better <br />3. Carrier to composite second order = 55 dB or better <br />4. Carrier to cross modulation = 55 dB or better <br />5. System signal level variations (peak to valley) = n +10 + 2 or better for <br /> all coaxial cable portions of the I-Net (where N = the number of amplifiers <br /> in cascade). <br /> <br />Bo <br /> <br /> Testing will occur twice yearly following the timing established in 47 C.F.R. <br />§ 76.601 and 76.605. <br />1. From the institution to the longest subscriber cascade. <br />2. From the institution through the applicable headend/hub site returning <br /> back to the same institution. <br />3. Performed using existing I-Net carriers active at the time of the testing, <br /> which will subject them to service interruptions. <br />4. Completed at Grantee-designated entry demarcation point at the <br /> institution. <br />5. The system will meet calculated worst case fully loaded video and audio <br /> measurements, taking into consideration existing 1-Net data loading at the <br /> time the measurement is taken. <br />6. Under ordinary operating conditions. <br /> <br />II. <br /> <br /> Digital Transmission <br />A. For I-Net that is 50% or more coaxial cable, a Bit Error Rate of 1 x 10(-8) at the <br /> demarcation point. <br /> 1. Outage times not included. <br /> 2. Ordinary operating conditions <br /> <br />For I-Net that is 50% or more fiber optic cable, a Bit Error Rate of 1 x 10(-9) at <br />the demarcation point. <br />1. Outage times not included <br />2. Ordinary operating conditions <br /> <br />C° <br /> <br />For both coaxial and fiber network, the company will meet or exceed a reliability <br />factor of 99.965% on an annual basis. <br /> <br />Testing will occur twice yearly, during the months of January/February and <br />July/August. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.