Laserfiche WebLink
-9- <br /> <br />development, two (2) one inch (1") service lines shall be provided. The cost of <br />the one inch (1") service shall be included with the lateral assessment. Any <br />parcel requesting a fire line or larger service shall be assessed the cost <br />difference on an individual basis. <br /> <br />210.015G <br /> <br />STORM DRAINAGE MAINLINE <br /> <br />Storm drainage costs are apportioned to the properties benefiting from the storm <br />drainage by the net area that is benefited from the storm drainage facility <br />constructed. The costs are then apportioned to each parcel by the rate-acre as <br />determined by dividing the cost by the net area of benefit then multiply that <br />cost/acre by the gross area of the parcel. <br /> <br />210.015H <br /> <br />STORM DRAINAGE LATERALS <br /> <br />Storm drainage laterals are considered incidental to the street constructions <br />and are assessed as part of the street costs. <br /> <br />210.0151 SIDEWALKS <br /> <br />Sidewalks are assessed to the benefiting properties by front footage or Unit <br />cost. <br /> <br />210.015J <br /> <br />STREETS: CITY/LOCAL/DISTRIBUTOR/COLLECTOR <br /> <br />Street costs are apportioned to the property benefiting from the street <br />construction. Apportioning the cost of the street construction may be done by <br />dividing the cost of the street improvements by the assessable front footage of <br />the benefiting properties or by dividing the costs of the street improvements by <br />the number of benefiting lots. <br /> <br />210.015K <br /> <br />STREETS: M.S.A./COUNTY ROADS <br /> <br />Properties along M.S.A. streets and county roads will be assessed for <br />street improvements in an amount equal to fifty percent (50%) of the <br />cost of a typical street related to the land use, i.e., residential, <br />commercial and industrial. The typical street cost includes the <br />construction cost plus fifty percent (50%) of the right-of-way <br />acquisition costs. The remaining cost will be paid from the M.S.A. <br />construction fund. For the purpose of this paragraph, the cost of a <br />"typical residential street" shall be defined as the cost determined <br />annually based on the construction costs during that year for each type <br />of street constructed to current City standards. <br /> <br />Properties with various physical abilities to support development will <br />have the typical street cost adjusted by the benefit factor. Benefit <br />factors for various types of land: marsh, wildlife, recharge, ponding <br />-BF=0. Peaty, low farm land -BF = 0.25. Restricted due to soils or <br />flooding but allowing scattered development. BF = 0.25-0.75. <br />Developable for residential/commercial and industrial BF = 1.0. <br /> <br />3. Properties along M.S.A. streets and county roads will be credited for <br /> previous street assessments, if any. <br /> <br /> <br />