My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/14/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 11/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:30:40 AM
Creation date
11/20/2023 12:02:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/14/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 19. <br /> CC Regular Session <br /> Meeting Date: 11/14/2023 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Information <br /> Title <br /> Adopt Resolution#23-282 Accepting Stabilized Full-Depth Reclamation Design Proposal for MSA Alpine Drive <br /> Reconstruction, Improvement Project#24-11 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#23-282 accepting stabilized full-depth reclamation design <br /> proposals for MSA Alpine Drive Reconstruction, Improvement Project#24-11. <br /> Background: <br /> The 2023—2032 Capital Improvement Plan(CIP)identifies Alpine Drive between Puma Street and Armstrong <br /> Boulevard(CSAH 83) for street reconstruction in 2024. <br /> To meet the required MSA design standards, several pavement sections were considered. Stabilized Full-Depth <br /> Reclamation(SFDR)was determined to be the most cost-effective method of reconstruction. This process <br /> involves reclamation(grinding in-place) of the existing bituminous pavement plus a portion of the underlying <br /> aggregate base. Excess reclaimed material is then removed as needed so the new pavement will match into the <br /> existing concrete curb and gutter, driveways, and cross streets. The remaining material receives liquid asphalt <br /> emulsion,which is then mixed in,rolled and compacted. Once compacted,the SFDR can be opened up to traffic, <br /> and gains strength with the further compaction of vehicle traffic. <br /> The City has recently completed an SFDR project on Sunwood Drive between Ramsey Boulevard and Bunker <br /> Lake Boulevard,Variolite Street between Alpine Drive and 173rd Avenue,both with excellent results. <br /> Additionally,this process was used in 2023 for the reconstruction of 167th Avenue between Nowthen Boulevard <br /> and Saint Francis Boulevard. Stabilizing the reclamation allows for a thinner overall pavement section, avoiding <br /> the need to excavate below the existing aggregate base to make costly subgrade corrections. In Alpine Drive, <br /> excavating the subgrade adjacent to the existing curb and gutter risks damage to the curb from settling during <br /> construction, and which would increase overall project costs. Staff is confident that the SFDR process will <br /> provide as long of a life for the new pavement section as a full reconstruction with subgrade corrections would, <br /> but at a significantly lower cost. <br /> To be eligible for Municipal State Aid(MSA) funding,MSA review and approval must be complete before <br /> opening bids for these improvements. The SFDR mix design is a requirement prior to MSA final approval. Staff <br /> sent the request for proposals to two (2) firms known to perform this type of work. One firm responded that they <br /> can not perform the work due to a backlog of work for existing clients. The one (1) quote received is tabulated <br /> below: <br /> STABILIZED FULL-DEPTH RECLAMATION MIX DESIGN PROPOSAL <br /> PROJECT AMERICAN ENGINEERING TESTING <br /> Alpine Drive Reconstruction $211875.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.