Laserfiche WebLink
American Engineering Testing submitted the lowest total responsible quote. Based on the submitted quote, Staff <br /> recommends accepting the proposal for stabilized full-depth reclamation mix design services from American <br /> Engineering Testing. <br /> American Engineering Testing is required to complete their work by Friday, December 29, 2023, and is <br /> anticipated to begin field work within 2—3 weeks of notice to proceed. <br /> Notification: <br /> If awarded, Staff will update the project webpage with notification of the pavement coring crews working on <br /> Alpine Drive. Staff has previously sent out project notification letters to impacted property owners,notifying them <br /> of the project webpage as the best source for project information. <br /> Observations/Alternatives: <br /> Alternatives: <br /> Motion to adopt Resolution#23-282 accepting stabilized full-depth reclamation design proposals for MSA Alpine <br /> Drive Reconstruction, Improvement Project#24-11. <br /> Funding Source: <br /> Funding for this improvement is proposed to come from Municipal State Aid Funds. <br /> Recommendation: <br /> Staff recommends adopting Resolution#23-282 accepting stabilized full-depth reclamation design proposals for <br /> MSA Alpine Drive Reconstruction, Improvement Project#24-11. <br /> Action: <br /> Adopt Resolution#23-282 accepting stabilized full-depth reclamation design proposals for MSA Alpine Drive <br /> Reconstruction, Improvement Project#24-11. <br /> Attachments <br /> Res 23-282 <br /> IP 24-11 SFDR RFP <br /> Form Review <br /> Inbox Reviewed By Date <br /> Bruce Westby Bruce Westby 11/09/2023 03:25 PM <br /> Brian Hagen Brian Hagen 11/09/2023 03:39 PM <br /> Form Started By:Joe Feriancek Started On: 11/06/2023 02:52 PM <br /> Final Approval Date:11/09/2023 <br />