My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/28/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 11/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:31:31 AM
Creation date
11/28/2023 12:18:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/28/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 20. <br /> CC Regular Session <br /> Meeting Date: 11/28/2023 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Information <br /> Title <br /> Adopt Resolution#23-299 Ordering Plans and Specifications for 2024 Neighborhood Pavement Overlay <br /> Improvements, Improvement Project#24-07 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#23-299 ordering plans and specifications for 2024 Neighborhood <br /> Pavement Overlay Improvements, Improvement Project#24-07. <br /> Background: <br /> The proposed 2024—2033 Capital Improvement Program(CIP) identifies seven(7) subdivisions for pavement <br /> overlay improvements in 2024. Street segment summaries are attached to this case. <br /> This project proposes to mill and overlay 7 subdivisions across the City. The projects total approximately 4.16 <br /> miles in length,with a varying mill thicknesses proposed. The project areas include: <br /> •Alpine Acres 1st&2nd <br /> o Generally located east of Sunfish Lake Blvd and north of Alpine Drive <br /> •Residential townhouse subdivision <br /> • Construction in 2004 <br /> •0.85 miles of 32' wide urban section with concrete curb &gutter <br /> • Crack seal/seal coat improvements in 2009 and 2016 <br /> • Crack seal improvement in 2023 <br /> o Subdivision was prioritized due to pavement stripping <br /> •Bowers Mississippi Acres Ist,2nd, &3rd <br /> o Generally located south of Riverdale Drive and 148th Avenue <br /> •Residential single-family house subdivision <br /> • Construction in 1982 <br /> •0.99 miles of mix 24' wide urban section with bituminous curbing and rural section with <br /> drainage swales adjacent to roadway <br /> • Crack seal/seal coat improvement in 1996 <br /> • Overlay improvement in 2004 <br /> • Crack seal/seal coat improvements in 2009 and 2016 <br /> o Subdivision was prioritized due to concerns pavement conditions falling beyond scope of pavement <br /> overlay improvement <br /> • Gateway Industrial Park 2nd <br /> o Generally located southwest of Bunker Lake Blvd and Sunfish Lake Blvd <br /> • Commercial/Industrial subdivision <br /> • Constructed between 1991 and 2003 <br /> •0.32 miles of 3 8' wide urban section with concrete curb and gutter <br /> • Crack seal/seal coat improvements in 2003, 2012 and 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.