Laserfiche WebLink
• Section 27 Unplatted <br /> o Generally located southwest of Bunker Lake Blvd and Sunfish Lake Blvd <br /> • Commercial/Industrial subdivision <br /> • Constructed in 2001 <br /> •0.47 miles of 40' wide urban section with concrete curb and gutter <br /> • Crack seal/seal coat improvements in 2006 and 2018 <br /> • Orchard Hills Townhomes <br /> o Generally located south of Alpine Drive and east of TH 47 <br /> •Residential townhouse subdivision <br /> • Construction in 2001 <br /> •0.30 miles of 32' wide urban section with concrete curb &gutter <br /> • Crack seal/seal coat improvements in 2006 and 2013 <br /> • Crack seal improvement in 2021 <br /> • Seasons of Ramsey <br /> o Generally located north of Bunker Lake Blvd, east of Center Street <br /> •Residential single-family and townhouse subdivision <br /> • Construction in 2013 <br /> •0.08 miles of 31' wide urban section with concrete curb &gutter <br /> • Subdivision was prioritized due to pavement condition and project location <br /> • Street patching due to Garden View development service connections <br /> •Development contributed funds towards overlay improvements <br /> •Town Center Gardens Ist,2nd,&3rd <br /> o Generally located north of Bunker Lake Blvd,west of Ramsey Blvd <br /> •Residential townhouse subdivision <br /> • Construction between 2004 and 2005 <br /> • 1.14 miles of 32' wide urban section with concrete curb &gutter <br /> • Crack seal/seal coat improvement in 2010 <br /> • Crack seal improvement in 2021 <br /> Proposed Improvements <br /> Review of ground penetrating radar(GPR), as-built plans, and the Bowers Drive Mill and Overlay Evaluation <br /> performed by Braun Intertec indicates three separate mill and overlay thicknesses will be used on the various <br /> street segments. Orchard Hills Townhomes subdivision does not have sufficient pavement thickness for a 2-inch <br /> mill and overlay improvements,therefore a 1.5-inch mill and bituminous overlay will likely be used. During <br /> design, other mill depths will be explored to determine the most efficient pavement section. After review of the <br /> Bowers Drive Mill and Overlay Evaluation,which is attached to this case for reference, Staff is proposing to <br /> perform a full-depth mill and pavement overlay. Additionally, some minor base corrections are anticipated to be <br /> required. All remaining subdivisions have sufficient existing bituminous thickness to perform a 2-inch mill and <br /> bituminous overlay. <br /> Per typical overlay improvements, spot concrete curb and gutter repairs will be performed on damaged curb. <br /> Where feasible,the City has switched to a saw& seal method for curb cracks at a significant cost savings. This is <br /> performed on hairline cracks,without vertical displacement. For areas of bituminous curbing, repairs to the <br /> curbing are not anticipated,though the City typically updates curb adjacent to storm sewer inlets to concrete <br /> during mill and overlay projects. <br /> Municipal sewer and water exist under all street segments in the project except for Bowers Drive. This project is <br /> not proposing any repairs to watermain or sanitary sewer. Minor storm sewer structure repairs,typically <br />