Laserfiche WebLink
CC Regular Session 7. 3. <br /> Meeting Date: 01/25/2022 <br /> By: Bruce Westby,Engineering/Public Works <br /> Information <br /> Title: <br /> Adopt Resolution#22-03 3 Rejecting Bids for Water Treatment Plant Trunk Watermain Improvements, <br /> Improvement Project#21-08 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#22-033 to reject bids for the Water Treatment Plant Trunk <br /> Watermain Improvements, Improvement Project#21-08. <br /> In addition, Staff is requesting City Council authorization to work with SEH, Inc. to revise the approved trunk <br /> watermain plans to reduce project costs based on bid results and feedback received from bidders and material <br /> suppliers, and to monitor the bidding environment to identify the most favorable time to bid the project again to <br /> receive additional and lower bids. <br /> Background: <br /> On March 9, 2021, the Ramsey City Council adopted attached Resolution#21-061 awarding a contract to SEH <br /> Inc. to prepare plans and specifications for Improvement Project#21-08, Water Treatment Plant Trunk <br /> Watermain Improvements. A copy of this resolution is attached. <br /> Plans were prepared with a base bid(Schedule 1) and an alternate bid(Schedule 2). <br /> •Base bid—Specifies a combination of construction methods whereby open trenching of plastic (PVC) <br /> watermain is specified along the south side of Bunker Lake Boulevard and the north side of 143rd Avenue, <br /> while directional drilling of plastic (PVC)watermain is specified at intersections, through Cottonwood <br /> Park,under Sunwood Drive, and under the stormwater pond between Hoya and Anderson Dahlen north of <br /> 143rd Avenue. <br /> •Alternate bid—Specifies directional drilling of plastic (PVC)watermain across as much of the project area <br /> as feasible. <br /> Copies of the title sheet and general layout from the approved plans are attached for reference. The general layout <br /> shows all locations of the proposed open trenching and directional drilling for the base bid(Schedule 1). <br /> Bids were publicly opened on Tuesday, January 4, 2022, at 10:00 a.m. A total of two (2)bids were received. <br /> Bids ranged from a high of$8,391,994.66 to a low of$6,737,287.45 across two bid schedules. Schedule 1 <br /> reflected the base bid(combination of open trench and horizontal directional drilling(HDD) installation methods), <br /> while Schedule 2 reflected the alternate bid(only HDD installation method). Below is a table showing the two <br /> bids received. <br /> Contractor Total Schedule 1 Bid Total Schedule 2 Bid <br /> Park Construction Co. $617371287.45 $7,0591102.16 <br /> Forest Lake Contracting, Inc. $7,652,529.55 $813911994.66 <br /> Engineer's Estimate $4,875,068.50 $4,916,194.50 <br />