My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/28/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 11/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:31:31 AM
Creation date
11/28/2023 12:18:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/28/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The low bid received is reflected in the Schedule 1 bid and was submitted by Park Construction Company, of <br /> Minneapolis,MN in the amount of$6,737,287.45. This bid was approximately 38%higher than the Engineer's <br /> Estimate of$4,875,068.50 due mainly to highly inflated PVC pipe costs,which is reflected in both bids. <br /> Notification: <br /> Bids were advertised in Finance and Commerce and in the Anoka Union Herald on Friday, October 29, 2021, and <br /> on November 5, 2021. Bids were also advertised online on QuestCDN. <br /> Time Frame/Observations/Alternatives: <br /> Observations: <br /> The bidding environment for utility pipes has grown increasingly volatile since 2020. This is due to an overall <br /> shortage of pipe and appurtenant materials for various material types. The 2020 winter ice storms caused <br /> refineries in Texas to shut down for an extended period of time,which resulted in a shortage of resin needed to <br /> manufacture plastic pipe that continues to this day. In addition, a general shortage of pipe and appurtenant <br /> materials exists due to continued supply chain disruptions caused primarily by a shortage of drivers resulting <br /> from the pandemic, as well as from previous shipping lane blockages and extreme weather events. All this is <br /> resulting in inflated pipe costs and long delays between the time materials are ordered and the time they are <br /> delivered. <br /> The attached memo from SEH's project manager further details the reasons for the volatile pipe bidding <br /> environment and goes on to say that at this time it is not known when this volatile bidding environment may <br /> subside. <br /> This project was ultimately bid to allow an extended bidding window of 2 months, and to allow bidders to <br /> substantially complete their work by mid-2023 so the trunk watermain will be operational before the new Water <br /> Treatment Plant is proposed to be commissioned in October of 2023. This was done to allow bidders as much <br /> time as possible to work with materials suppliers to receive the best bid prices possible. <br /> Unfortunately,both bids received were significantly higher that the engineer's estimate,with the low bid being <br /> $102,218.95 (38-percent)higher. Because of this and the other reasons noted in the attached bid rejection <br /> recommendation letter,the design engineer recommends rejecting both bids and not awarding a contract at this <br /> time to allow material and construction costs to be monitored during 2022 in anticipation that bidding the project <br /> again later in 2022 or in early 2023 will present more favorable bids and additional bidders to help reduce project <br /> costs. <br /> Since bids came in high for this project it is not unreasonable to expect inflated bids for the Water Treatment Plant <br /> as well. Staff therefore believes it is prudent to work to reduce costs for the both the Trunk Watermain <br /> Improvements and the Water Treatment Plant projects to avoid a need to further spend down existing sewer and <br /> water enterprise funds, or increase the amount we may need to bond for a portion of the improvements. <br /> Alternatives: <br /> Alternative#1 —Motion to adopt Resolution#22-03 3 rejecting bids for the Water Treatment Plant Trunk <br /> Watermain Improvements, Improvement Project#21-08, and authorizing Staff to work with SEH, Inc. to revise <br /> the approved plans to reduce project costs and to monitor the bidding environment to identify the most favorable <br /> time to bid the project again. <br /> Alternative#2—Motion of other. <br /> Funding Source: <br />
The URL can be used to link to this page
Your browser does not support the video tag.