My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/28/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 11/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:31:31 AM
Creation date
11/28/2023 12:18:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/28/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C9) <br /> SEH <br /> Building a Better World <br /> for All of Us" MEMORANDUM <br /> TO: Mr. Bruce Westby <br /> FROM: Chad Setterholm, PE (Lic.MN)) <br /> DATE: January 12, 2022 <br /> RE: Water Treatment Plant Trunk Watermain Improvements - Elevated Bid Costs <br /> SEH No. RAMSY 159783 14.00 <br /> On Tuesday, January 4, 2022, at 10:00 a.m., two (2) bids were received for the above-referenced project. <br /> The bids ranged from a high of$8,391,994.66 to a low of$6,737,287.45 across two bid schedules. <br /> Schedule 1 reflected a combination of open cut and horizontal directional drilling (HDD) installation <br /> methods for PVC watermain construction while Schedule 2 reflected only the HDD installation method. <br /> Contractor Total Schedule 1 Bid Total Schedule 2 Bid <br /> 1 Park Construction Co. $617377287.45 $770597102.16 <br /> 2 Forest Lake Contracting, Inc. $7,6527529.55 $873917994.66 <br /> Engineer's Estimate $4,8757068.50 $479167194.50 <br /> The low bid received was reflected in the Schedule 1 bid and was submitted by Park Construction <br /> Company, of Minneapolis, MN in the amount of$6,737,287.45. This bid was approximately 38% higher <br /> than the Engineer's Estimate of$4,875,068.50, mainly due to highly inflated PVC pipe costs reflected in <br /> both bids. <br /> Due to current volatility within the supply chain for components such as resin used for manufacturing PVC <br /> pipe and a lingering shortage of pipe extruder labor as manufacturing scaled down due to chemical <br /> shortages of available components needed for making PVC pipe. Resin shortages are largely associated <br /> with chemical plant shutdowns in Texas and Louisiana during the severe freezing temperatures in early <br /> 2021 which also affected pipe manufacturing plant operations. This scenario and the ongoing pandemic <br /> drove pipe material and construction costs up substantially by the end of 2021. <br /> If costs continue to rise in 2022, it will increase the likelihood of change orders as contractors pursue <br /> claims to recover unforeseen costs not recognized in their bids. This will add additional fiscal challenges <br /> for the project. <br /> The low number of bids received was likely reflective of the highly inflated pipe material costs adding to <br /> the fiscal risk of prime contractor bonding for the high cost associated with the work being performed by <br /> the subcontractor performing the horizontal directional drilling component of the watermain installation. <br /> This may have caused some contractors to not submit bids if it reduced the bond capacity available for <br /> other projects they were pursuing or were currently under contract. <br /> Accordingly, we recommend the project not be awarded at this time to allow material and construction <br /> costs to be monitored during 2022 with the anticipation a rebid for late 2022 or early 2023 will present <br /> more favorable bids and additional bidders for 2023 construction of the improvements. While it is difficult <br /> Engineers I Architects I Planners I Scientists <br /> Short Elliott Hendrickson Inc.,3535 Vadnais Center Drive,St.Paul,MN 55110-3507 <br /> 651.490.2000 1 800.325.2055 1 888.908.8166 fax I sehinc.com <br /> SEH is 100%employee-owned I Affirmative Action—Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.