My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 12/14/2023
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2023
>
Agenda - Parks and Recreation Commission - 12/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:37:43 AM
Creation date
12/8/2023 3:42:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
12/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL SPECIFICATIONS <br /> Remove and recycle existing play equipment and associated appurtenances <br /> and design and install new playground appropriate for a community park. <br /> Prequalificatiori s: <br /> I. Bidder/Contactor shall demonstrate that he/she has successfully installed 3 (three) <br /> similar playgrounds in a county, municipal or school setting in the Twin Cities <br /> Metropolitan area within the last 5 (five) years. <br /> II. Bidder/Contractor shall not be disbarred or disqualified from working on <br /> playground related construction projects by any municipality, county or school <br /> districts in the State of Minnesota. <br /> Introduction and General Information: <br /> • In submitting a proposal, the Contractor warrants that mobilization and material <br /> handling necessary to install ALL play equipment and improvements as proposed <br /> is wholly included in their proposal. <br /> • Contractor responsible for viewing the existing site, to review the scope of <br /> removals, and infrastructure to remain and protect. <br /> • There are no known underground obstructions (E.g. abandoned footings,utilities) <br /> at the park location. <br /> • This Request for Proposal shall be anot-to-exceed amount. The Contractor must <br /> include within his/her quote any time or materials necessary to complete the work <br /> in a professional and quality manner. E.g. if matting is required due to wet <br /> conditions or to protect trail surfaces and tree rooting zones—this expense is that <br /> of the Contractor. There will be no Change Orders. <br /> • Work site may be required to be enclosed with temporary safety fencing—if the <br /> contractor is not physically on site. Fencing is not required if there are no <br /> equipment or loose items/tools anywhere on site, aside from loose major play <br /> components that do not constitute a hazard, and/or plywood/work mats (if <br /> used), which may be present until job completion. <br /> 21Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.