My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 12/14/2023
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2023
>
Agenda - Parks and Recreation Commission - 12/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:37:43 AM
Creation date
12/8/2023 3:42:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
12/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule: <br /> A schedule for delivery/placement shall be coordinated between the City and Contractor <br /> in February—following a playground refurbishment project.Once work has commenced, <br /> the Contractor shall continuously pursue completion in accordance with the approved <br /> schedule. The goal of these specifications is to minimize the number of days the <br /> playground is out of service. <br /> Payment: <br /> Payment will be made upon submittal of an invoice to the City on a net 30-day basis <br /> following City acceptance of the work (there will be no partial payments, nor change <br /> orders). <br /> Quotation Duration: <br /> The Contractor in submitting their quote, acknowledges the amount shall be honored for a <br /> period of 60 days from the date of submission. Fuel costs must be included within the <br /> quoted amounts. <br /> Specifications: <br /> The Contractor shall conduct his/her work in conformance with the specifications set forth <br /> herein, and in accordance with safe construction practices. Further: <br /> • Engineered Wood Fiber must be IPEMA Certified (Virgin Pine Chips or Natures <br /> Plus Tamarack—to be specified on the Quotation Form). <br /> • Documentation must be provided from the EWF manufacturer that it meets ASTM <br /> 1951 standards. <br /> • The existing EWF in place is 3-years old and'springy' the new EWF is to add to the <br /> total depth and to freshen the entire area within the boulder containment border. <br /> The volume of new material delivered or placed, shall be a minimum of 6" inches <br /> in depth for all areas within 6' feet of any play structure or feature within the <br /> containment border. For all other areas within the boulder containment border and <br /> more than 6' feet from any play structure or feature the depth shall be a minimum <br /> of 2" inches. <br /> • Delivery and placement shall be in the location(s) shown below, at the park at 14201 <br /> Waco Street, Ramsey MN 55303. <br /> 31Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.