My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 01/11/2024
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2024
>
Agenda - Parks and Recreation Commission - 01/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:34:47 AM
Creation date
1/11/2024 1:18:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
01/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• All parts must have a corrosion resistant finish and be capped on the top and all <br />ends. <br />• All metal decks must be manufactured from sheet steel conforming to ASTM <br />specification A-569 and be finished with a vinyl coating. <br />• All connecting hardware used must be zinc plated or stainless steel, free of <br />protrusions, vandal resistant and have a tamper proof design. Service kit for <br />tamper proof fasteners must also be provided. <br />Containment Border and Surfacing Specifications: <br />• Provide and install engineered wood fiber surface material to meet the <br />requirements of ASTM 1951 for accessibility. Documentation must be provided <br />from the EWF manufacturer that it meets ASTM 1951 standards. <br />• Provide and install Poured in Place accessible route to swings, under swing area, <br />to a transfer point on the main structure and at the bottom of any slide. <br />• Lump sum proposals for both Scope A and Scope B shall include all costs to <br />provide 6"x12" stand up concrete border for entire new perimeter(s) of play <br />area(s) as determined by submitted design(s). Existing concrete curb may be <br />maintained, modified or removed to facilitate your design. Existing asphalt <br />paths are to remain in areas outside of delineated areas for Scope A and B Scope <br />B proposals. All concrete curb should follow grade and be flush to top of <br />existing asphalt paths. <br />Proposal Scope and Opportunity: <br />The goal and objective of this Request for Proposal for a replacement playground <br />at Alpine Park is to deliver the maximum play value and enduring interest for <br />families and children —in relation to the investment in a new playground and its <br />associated site redevelopment. Therefore, the city is inviting up to two (2) different <br />proposals per contractor/vendor, though only a single proposal may be submitted <br />at the contractor's discretion. This RFP is challenging contractor/vendors to use <br />their professional expertise and creativity to develop a unique playground befitting <br />this community park. Proposers are encouraged to work with a landscape architect <br />in the design and site work intended, particularly for the Scope B category. <br />7 1 F1arri <br />
The URL can be used to link to this page
Your browser does not support the video tag.