My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 01/11/2024
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2024
>
Agenda - Parks and Recreation Commission - 01/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:34:47 AM
Creation date
1/11/2024 1:18:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
01/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 2. <br />Park and Recreation Commission <br />Meeting Date: 01/11/2024 <br />Primary Strategic Plan Initiative: Connect the community through Parks, Trails and Recreational Programming. <br />Information <br />Title <br />Approve Landscape for Central Park Main Parking Lot Reconstruction, Improvement Project #23-02 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to recommend to City Council the completion of the Central Park Main Parking Lot <br />Reconstruction, Improvement Project #23-02 by the addition of trees, shrubs, and irrigation into the two new <br />median swales at the park. <br />Background: <br />City Improvement Project #23-02 entailed the reconstruction of Central Park's main parking lot in 2023. The <br />preponderance of that project has been successfully completed —remaining is the landscape elements within the <br />swales. <br />Project History: <br />• April 12, 2022, Resolution #22-089, the Ramsey City Council accepted a proposal for a topographic survey <br />of the project area from Bolton & Menk. <br />• June 21, 2022, the Ramsey Public Works Committee (PWC) reviewed bicycle and pedestrian facilities as <br />part of the 161St Avenue Street Reconstruction. The PWC recommended extending pedestrian facilities with <br />a goal of minimizing tree impacts and existing park facilities. Those recommendations were incorporated <br />into the parking lot reconstruction plans. <br />• November 10, 2022, the Ramsey Park and Recreation Commission (PRC) had a discussion of the proposed <br />Central Park parking lot reconstruction as part of consideration of the 2023 — 2032 Parks Capital <br />Improvement Plan. The PRC supported the project in general, specifically using medians to collect <br />stormwater runoff and provide shade trees. Additionally, using the available green space adjacent to the <br />parking lot to increase the footprint of the parking lot, while not losing trees. The PRC supported a one-way <br />directional parking lot layout to increase safety for pedestrians, but also to maximize stall count if possible. <br />• November 15, 2022, the PWC recommended City Council authorization to prepare plans and <br />specifications. The PWC generally supported the project, including creating the medians to provide shade <br />trees, using the available green space adjacent to the parking lot to increase the footprint of the parking lot <br />while not losing trees. The PWC also supported a two-way parking lot layout to maximize the total stall <br />count. <br />• December 13, 2022, Resolution #22-285, the Ramsey City Council ordered the City Engineer to prepare <br />plans and specifications for Improvement Project #23-02, Central Park Main Parking Lot Reconstruction. <br />• July 18, 2023, the PWC recommended City Council approve plans and specifications and authorize an <br />advertisement for bids for Central Park Main Parking Lot Reconstruction, Improvement Project #23-02. <br />• July 25, 2023, Resolution #23-166, the Ramsey City Council approved plans and specifications and <br />authorized an advertisement for bids. <br />• August 10, 2023, the Park and Recreation Commission recommended City Council partially fund Central <br />Park Main Parking Lot Reconstruction using Park Improvement Trust Funds. <br />• October/November 2023, the concrete curbing, storm water infrastructure, and paving was completed, and <br />readied for the planned -for planting and irrigation elements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.