My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 01/11/2024
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2024
>
Agenda - Parks and Recreation Commission - 01/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:34:47 AM
Creation date
1/11/2024 1:18:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
01/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Project Improvements: <br />The landscape elements consist of the planting of a mix of Swamp White Oak, River Birch, Tamarack, 109 shrubs <br />(two species), 80 cubic yards of landscape mulch, 20 cubic yards of soil amendments; and the installation of <br />basic irrigation for the two large medians within the parking lot. The first attachment highlights the planting <br />palette which was selected for hardiness for the site as well as visual appeal throughout the seasons. The <br />fast-growing River Birch and Tamarack will also provide valuable shade for the parking stalls on the north side of <br />both medians. <br />Notification: <br />Notifications are not required with this case. <br />Observations/Alternatives: <br />Staff has developed a project estimate to complete this project at approximately $45,000 for all the landscape <br />work, and $10,000 for the required irrigation components, including a new controller to be installed in the <br />warming house with wires and four valves to be installed near the pickleball courts. This combined total of $55k <br />includes mobilization and all other incidentals for a project to be completed by May 15, 2024. <br />The next steps for this project following Park & Recreation Commission approval, will be to solicit quotes and <br />obtain City Council approval of the Capital Improvement Project on January 23rd, 2024. <br />Funding Source: <br />Funding for the landscape and irrigation improvements will be from Park Improvement Trust Fund, which has an <br />existing balance of $7.4M <br />Recommendation: <br />Recommendation: <br />Staff recommends proceeding with the completion of the parking lot reconstruction project this case describes. <br />Action: <br />Motion to recommend to City Council the completion of the Central Park Main Parking Lot Reconstruction <br />project, with installation of landscape and irrigation at a not -to -exceed amount of $55,000 from the Park Trust <br />Fund. <br />Attachments <br />Existing conditions and plant palette <br />23-02 Final Plans <br />Form Review <br />Inbox Reviewed By Date <br />Bruce Westby Bruce Westby 01/05/2024 12:52 PM <br />Brian Hagen Brian Hagen 01/05/2024 01:31 PM <br />Form Started By: Mark Riverblood Started On: 01/03/2024 11:34 AM <br />Final Approval Date: 01/05/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.