My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/16/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 01/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:45:52 AM
Creation date
1/16/2024 3:01:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 3. <br />Public Works Committee <br />Meeting Date: 01/16/2024 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Consider recommending City Council approval of adding streets within Riversbend 3rd, 4th, and Plaza <br />subdivisions to MSA Xkimo Street Reconstruction, Improvement Project #24-05 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending City Council approval of adding streets within Riversbend <br />ad, Riversbend 4th, and Riversbend Plaza subdivisions to MSA Xkimo Street Reconstruction, Improvement <br />Project #24-05 . <br />Background: <br />On August 22, 2023, the Ramsey City Council directed the Mayor and City Administrator to execute the proposal <br />from Hakanson Anderson to prepare final plans and specifications for MSA Xkimo Street Reconstruction, <br />Improvement Project #24-05. This project proposes to reconstruct 0.29 miles of Xkimo Street between 141d <br />Avenue and Trunk Highway 47. <br />At previous Public Works Committee meetings, including the November 21, 2023 meeting during review of the <br />2024 MSA and Neighborhood Overlay Improvement projects, the committee has made recommendations to <br />complete improvements of entire subdivisions when possible and practical. This avoids going into the same area <br />multiple times, and minimizing disturbance and impacts to the property owners. <br />During the public open house for this improvement project held on December 14, 2023, Staff received comments <br />from residents of how poor condition the pavement on the cul-de-sacs adjacent to Xkimo Street are. <br />Staff is aware of the poor condition of the 143rd Avenue, 143rd Lane, and Xkimo Court cul-de-sacs adjacent to <br />Xkimo Street, and believe extensive patching will likely be required annually on the streets until the streets are <br />reconstructed. The Xkimo Street cul-de-sac, which is the continuation of the street south of 142nd Avenue will <br />likely require some patching in the coming years, though not to the extent of the other three. During sight plan <br />review Staff noted block cracking and additional alligator cracking on the edge of the pavement, which was not <br />apparent or noted during the PASER evaluations in the summer. Due to this, Staff does not feel a pavement <br />overlay is the most economical pavement treatment for this segment and a reclamation type reconstruction is <br />recommended. <br />The current 2024 through 2033 10-year Capital Improvement Program (CIP) proposes street reconstruction of <br />Riversbend 3-d and 4th in 2027. The CIP proposes a pavement mill and overlay of Riversbend Plaza (Xkimo <br />Street cul-de-sac) in 2027. Staff proposes to move the improvements up to 2024 and to include as part of the <br />MSA Xkimo Street Reconstruction project as street reconstructions. <br />Hakanson Anderson is currently working on plan development for Xkimo Street Reconstruction. City Staff has <br />had some initial discussions with Hakanson Anderson and does not believe adding the additional streets will <br />impact the project timelines. Currently, Staff is anticipating bringing final plans to City Council in March for <br />approval, allowing bid opening to occur in late March or April, and construction to begin in May to June of 2024. <br />Notification: <br />
The URL can be used to link to this page
Your browser does not support the video tag.