Laserfiche WebLink
Introduction <br /> This report documents a traffic study completed along CSAH 5 (Nowthen Boulevard) in Ramsey, <br /> MN.The project study area is shown in Figure 1.Anoka County desires to improve its understanding <br /> of future needs along this corridor, as it is anticipated that the corridor will be impacted by current <br /> and future improvements to US Highway 10 in the cities of Anoka and Ramsey. The main objectives <br /> of this study are to review existing operations, develop/evaluate future traffic forecasts for the <br /> corridor, and analyze potential intersection improvements which may help serve future traffic <br /> demands. The following information provides the assumptions, analysis, and recommendations <br /> offered for consideration. <br /> Figure 1:CSAH 5 Study Area <br /> CSAH 64(1 S 111 Ave) <br /> CSAH 63 <br /> Y <br /> (Green Valley Rd) '00 ' <br /> CSAH 63 (1751�1 Ave) <br /> 170111 Ave <br /> 1671f' Ave <br /> CSAH 56 <br /> 4' (Ramsey Blvd) <br /> \ CSAH 57 <br /> (Sunfish Lake Blvd) <br /> Alpine Dr <br /> G <br /> Sunwood Dr <br /> Y <br /> Dysprosium St TH 4 <br /> (St. F ancis Blvd) <br /> Legend <br /> Study Corridor <br /> Study Area <br /> Key Intersections <br /> 0 other Intersections <br /> 2 <br />