My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/23/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 01/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:01:09 AM
Creation date
1/22/2024 3:44:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Key Findings and Recommendations <br /> Based on the results of the of the existing and future year analysis which was completed for the CSAH <br /> 5 Corridor Traffic Study, four intersections along the CSAH 5 corridor were considered in the <br /> development of improvements to address capacity and safety performance. These intersections <br /> include: <br /> • CSAH 5 and CSAH 63 (Green Valley Road and 175th Avenue) <br /> • CASH 5 and 167th Avenue NW <br /> • CSAH 5 and CSAH 56 (Ramsey Boulevard) <br /> • CSAH 5 and Sunwood Drive <br /> The following key findings and recommendations for each of the four intersections along CSAH 5 <br /> were developed as a result of the CSAH 5 Corridor Traffic Study <br /> CSAH 5 and CSAH 63 <br /> An elevated crash history was observed at both the east and west intersections of CSAH 5 and CSAH <br /> 63. Traffic volumes are anticipated to increase at these intersections as the surrounding area develops. <br /> Additional turn lanes will reduce the conflicts and crash risks under future year conditions. <br /> Furthermore, the installation of lighting will help alert drivers to the intersections at night. The <br /> marginal costs of the proposed improvements at this intersection would potentially decrease if the <br /> improvements are coordinated with future corridor investments. <br /> Recommendation: Implement turn lane improvements and lighting as part of the next preservation <br /> investment to improve safety and modernize intersections to support future growth. <br /> CSAH 5 and 167th Ave NW <br /> 167th Avenue NW functions as an east-west roadway. Higher crash rates were observed at the CSAH <br /> 5 and 167th Avenue NW intersection compared to the majority of the intersections along the CSAH <br /> 5 corridor. The roundabout concept was found to be the most cost-effective improvement for this <br /> intersection with an estimated 12-year return on investment. <br /> Recommendation: Implement a roundabout as part of the next preservation investment to improve <br /> safety and serve the function of 167th Ave as an east-west corridor. <br /> CSAH 5 and CASH 56 (Ramsey Blvd) <br /> An elevated crash history was observed at the CSAH 56 (Ramsey Boulevard) intersection, including <br /> injury crashes.The traffic volume from northbound CSAH 56 to northbound CSAH 5 is expected to <br /> increase with the completion of the interchanges on US Highway 10. Turn lane and roundabout <br /> concepts were considered for this location; both concepts have a similar construction cost, <br /> approximately $3,000,000, and impacts to surrounding land use. The roundabout concept provides <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.