Laserfiche WebLink
The improvements for this concept include: <br /> • Slight realignment of CR 63 (Green Valley Road) to be more perpendicular to CSAH 5 <br /> • Right turn lane addition to CR 63 <br /> • Changed surhbound bypass lane configuration to dedicated left turn and through lane <br /> The estimated construction cost of the intersection improvement at CSAH 5/CR 63 (Green Valley <br /> Road) is $3,100,000. <br /> The concept for the improvements at CSAH 5 and CR 63 (175th Avenue N` ) is shown in Figure 6. <br /> Figure 6:CSAH 5 and CR 63(175th Avenue NW)Intersection Improvement Concept <br /> X <br /> if <br /> � 4 <br /> 66, <br /> IF <br /> �I <br /> I <br /> n� <br /> The improvements for this concept include: <br /> • Northbound and Southbound bypass at CR 63 (175th Avenue NFU) lanes converted to <br /> dedicated left turn lanes. <br /> The estimated construction cost of the intersection improvement at CSAH 5/CR 63 (175th Avenue <br /> NWT is $1,200,000. <br /> 18 <br />