Laserfiche WebLink
CSAH 5 and 167th Avenue <br /> The intersection improvement concept for the CSAH 5/167th Avenue intersection includes <br /> converting the intersection into a roundabout. The roundabout option slows traffic to allow for safer <br /> turn moves and improved sightlines. The roundabout improvement concept for the CSAH 5/167th <br /> Avenue intersection is shown in Figure 7. <br /> Figure 7:CSAH 5 and 167th Avenue Intersection Improvement Concept <br /> Yom <br /> 44 <br /> % <br /> w <br /> 66 <br /> i + . <br /> /Nh <br /> t <br /> t <br /> �t <br /> TFc". <br /> ,B <br /> This improvement concept would require new right of way and would likely require a pond. The <br /> estimated construction cost of this improvement concept is $3,000,000 - $45000,000. <br /> CSAH 5 and CSAH 56 (Ramsey Boulevard) <br /> Two intersection improvement concepts were developed for the CSAH 5/CSAH 56 (Ramsey <br /> Boulevard) intersection. The first improvement includes converting the intersection into a <br /> roundabout. The roundabout option slows traffic to allow for safer turn moves and improves <br /> sightlines. The roundabout improvement concept for the CSAH 5/CSAH 56 (Ramsey Boulevard) <br /> Ave intersection is shown in Figure 8. <br /> 19 <br />