Laserfiche WebLink
Table 9:CSAH 5/CSAH 56(Ramsey Boulevard)Comparison Table <br /> Radius(Feet) Superelevation Design/Advisory Right of Way Impacts Cost <br /> Speed <br /> 870(existing) 0.06 50 mph advisory N/A N/A <br /> 960 0.08 55 mph Minor $273009000 <br /> 11200 0.08 60 mph Moderate $273009000 <br /> 11200 0.055 55 mph advisory Moderate $293007000 <br /> 17432 0.057 55 mph Possible total takes $296007000 <br /> 27000 0.054 60 mph Total Takes $3,100,000 <br /> The optimal design among these options is understood to be the 1,200 foot radius with a 0.055 <br /> superelevation and 55 mph advisory speed. This option balances brining the design of the curve up <br /> to the posted speed without incurring extreme right of way cost impacts. <br /> 22 <br />