My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/23/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 01/23/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:01:09 AM
Creation date
1/22/2024 3:44:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CSAH 5 and Sunwood Drive N <br /> The improvement concept developed for the CSAH 5/Sunwood Drive intersection includes <br /> converting the intersection into a roundabout. The roundabout improvement concept for the CSAH <br /> 5/Sunwood Drive NW intersection is shown in Figure 10. <br /> Figure 10:CSAH 5 and Sunwood Drive NW Intersection Improvement Concept <br /> MOJO+ 1 <br /> 4r.— <br /> vdw <br /> VO <br /> MI <br /> �T �V <br /> Y° � <br /> AO <br /> ap 1 y,qr y <br /> a = <br /> 4 s S <br /> • <br /> The roundabout option slows traffic to allow for safer turn moves. Additionally, the roundabout <br /> concept provides safer pedestrian accommodations. The roundabout concept does require new right <br /> of way and may require a pond. The estimated construction cost for the realignment improvement <br /> concept at CSAH 5/Sunwood Drive is $2,000,000 - $4,000,000. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.