Laserfiche WebLink
CSAH 5 and Sunwood Drive N <br /> The improvement concept developed for the CSAH 5/Sunwood Drive intersection includes <br /> converting the intersection into a roundabout. The roundabout improvement concept for the CSAH <br /> 5/Sunwood Drive NW intersection is shown in Figure 10. <br /> Figure 10:CSAH 5 and Sunwood Drive NW Intersection Improvement Concept <br /> MOJO+ 1 <br /> 4r.— <br /> vdw <br /> VO <br /> MI <br /> �T �V <br /> Y° � <br /> AO <br /> ap 1 y,qr y <br /> a = <br /> 4 s S <br /> • <br /> The roundabout option slows traffic to allow for safer turn moves. Additionally, the roundabout <br /> concept provides safer pedestrian accommodations. The roundabout concept does require new right <br /> of way and may require a pond. The estimated construction cost for the realignment improvement <br /> concept at CSAH 5/Sunwood Drive is $2,000,000 - $4,000,000. <br /> 23 <br />