Laserfiche WebLink
Table 5- Opening Year(2027) Build Intersection Analysis <br /> Lord of Life SimTraffic Delay Summary -2027 AM Build Peak Traffic <br /> Operations by Movement Overall <br /> Left Through Right Intersection <br /> Intersection Control Approach <br /> Delay LOS Delay LOS Delay LOS Delay LOS <br /> (sec/veh) (sec/veh) (sec/veh) (sec/veh) <br /> EB 7.3 A 10.9 B 6.3 A <br /> CSAH 5& Minor WB 12.6 B 13.0 B 2.9 A <br /> Sunwood Road 13.0 B <br /> Drive Stop NB 3.1 A 0.8 A 0.1 A <br /> SB 0.5 A 1.3 A 0.1 A <br /> Sunwood Minor EB 0.0 2.2 A I 2.0 I A <br /> Drive& � <br /> Road WB 1.9 A 1.1 A 0.0 A 4.6 A <br /> I I <br /> Cobalt NB 4.6 A - - 2.6 A <br /> Street Stop <br /> SB - - - - - - <br /> EB 31.2 C 43.4 D 6.5 A <br /> M N-47& WB 44.3 D 44.9 D 8.6 A <br /> Sunwood Signal 8.8 A <br /> Drive NB 48.3 D 5.3 A 2.9 A <br /> SB 44.1 D 4.5 A 1.4 A <br /> EB 6.4 0.0 A I 8.1 I A <br /> CSAH 5& Minor - _ <br /> 146th Road WB 2.7 A - - 6.4 A <br /> Avenue Stop NB 0.5 A 0.0 A 1.4 A <br /> SB - - 0.8 A 1.5 A <br /> CSAH 5& Minor WB 10.0 A - - 3.0 A <br /> Lord of Life Road NB _ _ 0.4 A 0.0 A 10.0 A <br /> Access Stop <br /> SB 1.0 A 0.8 A - - <br /> EB 11.6 �I - - I 15.5 I C <br /> CSAH 5& Minor WB 24.5 �I - - I 18.2 � C <br /> Iodine Road 24.5 C <br /> Street Stop NB 9.6 A 0.7 A 0.4 A <br /> SB 1.7 A 2.1 A 0.4 A <br /> EB - - 2.7 A 1.1 A <br /> CSAH 5& Minor WB 12.6 B 1.2 A - - <br /> Dysprosium Road NB 25.2 D - - 10.7 B 25.2 D <br /> Street Stop <br /> SB _ _ _ _ - _ <br /> EB 36.8 �I 37.7 D I 4.0 I A <br /> MN-47& WB 46.7 �I 34.5 C I 9.1 I A <br /> CSAH 5 Signal NB 45.8 D 5.9 A 1.2 A 17.6 B <br /> SB 46.8 D 18.9 B 7.1 A <br /> For Side Street Stop intersections,the worst individual movement was reported for the overall intersection LOS. <br /> Haviland Fields-Ramsey, MN <br /> Traffic Impact Analysis I July 2023 <br />