My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 08/21/2023
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2023
>
Agenda - Environmental Policy Board - 08/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:14:19 AM
Creation date
1/23/2024 12:09:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
08/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C d <br /> Preparing EAWS:A Procedural Guide for <br /> Local RGUs <br /> Step 7—Start a project file <br /> If it has not already been done,RGU staff should start a Local Governments"located on the EQB website. <br /> file for the project and keep copies of all written or email <br /> correspondence,faxes,contracts,etc. RGU staff will also Project proposers sometimes have the ability to complete the <br /> want to keep track of their phone calls with the proposer, data portions of the EAW in as little as 2 weeks time,so RGU <br /> including the dates,times,and subject of their calls in a phone staff should attempt to retain a consultant as soon as possible. <br /> log. <br /> As citizens will sometimes submit comments to the RGU Step 9—Evaluate the proposer's EAW data <br /> prior to the EAW public comment period,RGU staff will submittal <br /> likely want to keep copies of these letters with the project <br /> file. While the RGU is only required to respond to substantive MN Rule 4410.1400 provides the following information <br /> regarding the completeness of a proposer's data submittal: <br /> comments submitted during the official public comment <br /> period citizen comment letters submitted prior to this time <br /> can sometimes raise important issues that a local government "When an EAW is to be prepared, the proposer shall submit <br /> will want to review and/or address during either the EAW the completed data portions of the EAW to the RGU. The <br /> preparation or through local permitting procedures. RGUshall promptly determine whether the proposer's <br /> submittal is complete. <br /> If the RGU determines that the submittal is incomplete,the <br /> Helpful Tip RGUshall return the submittal to the proposer for completion <br /> RGU staff should make certain project proposers of the missing data. If the RGU determines that the submittal <br /> are aware of the EQB's"EAW Guidelines:Pre- is complete,the RGUshall notify the proposer of the <br /> paring Environmental Assessment Worksheets", acceptance of the submittal within five days. <br /> located on the EQB website at: The RGU shall have 30 days from notification to add <br /> supplementary material to the EAW,if necessary,and <br /> htlp://www.DLnplan.state.mn.us-/Pdf/2000 to approve the EAW for distribution. The RGU shall <br /> eawrules.pdf. be responsible for the completeness and accuracy of all <br /> information. " <br /> This document provides item-by-item guidance for <br /> completing an EAW. RGUs and project proposers can consult"EAW Guidelines: <br /> Preparing Environmental Assessment Worksheets",for item- <br /> by item assistance on the types of information needed for the <br /> EAW. This document,can be found on the EQB website at: <br /> Step 8—Retain a consultant[if needed] http://www.mnplan.state.mn.us/pdf/2000/eqb/eawrules.adf. <br /> RGU staff will need to determine whether or not their RGU staff should use the information in this document to help <br /> organization has the staff time and expertise to review the <br /> data portions of the EAW submitted by the project proposer, determine whether a proposer's data submittal is accurate and <br /> suggest EAW changes,and perform other requirements of complete. <br /> the environmental review process without the assistance <br /> of a consultant. If not,and it will be necessary to hire a Step 10-Prepare the EAW for final release <br /> consultant for environmental review,RGU staff should make Once an RGU has received the data submittal from the project <br /> the necessary arrangements for doing so at this stage of the proposer,determined the submittal is complete,and notified <br /> process. the proposer of the completeness of the data submittal,the <br /> RGU has 30 calendar days to edit and finalize the EAW <br /> Each local government may carry out this step in a different document. At this point in the process,the RGU is mostly <br /> way,though,according to its own local ordinances and editing the document for understandability,spelling/grammar, <br /> procedures. For more information on using consultants during etc. The RGU may also add supplementary material to the <br /> environmental review,please see the EQB document titled, EAW at this time in order to provide more information about <br /> "Hiring a Consultant for Environmental Review:A Guide for the project's potential for significant environmental effects. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.