Laserfiche WebLink
Estimated project costs for each segment were developed to allow for the City to plan for the sequenced <br /> implementation of the improvements and are summarized later in this report. <br /> IX. COST ANALYSIS <br /> Costs estimates were developed for each improvement type. These estimates are based on recent bid <br /> pricing and similar projects. The segments are depicted on Figure 2 in Appendix B. All costs are <br /> presented as 2023 costs. <br /> Ramsey Parkway <br /> Improvement Segment A-1 Segment A-2 <br /> Roadway $ 98800 $ 50000 <br /> Trails/Sidewalks $ 1961000 $ 9900 <br /> Street Lighting $ 2891000 $ 14600 <br /> Storm Sewer $ 5301000 $ 26800 <br /> Trunk Storm Sewer $ 2600 $ 0 <br /> Watermain $ 2461000 $ 1731000 <br /> Sanitary Sewer $ 1041000 $ 971000 <br /> Trunk Sanitary Sewer $ 294,000 $ 0 <br /> Total Costs $ 216731000 $ 1128300 <br /> Center Street <br /> Improvement Segment B-1 Segment B-2 <br /> Roadway $ 11400 $ 5431000 <br /> Trails/Sidewalks $ 441000 $ 1531000 <br /> Street Lighting $ 741000 $ 20400 <br /> Storm Sewer $ 401000 $ 1321000 <br /> Watermain $ 0 $ 0 <br /> Sanitary Sewer $ 0 $ 0 <br /> Total Costs $ 27200 $ 1,032,000 <br /> Yolite Street Zeolite Street <br /> Improvement Segment E Segment F-1 Segment F-2 <br /> Roadway $ 4191000 $ 4121000 $ 4261000 <br /> Trails/Sidewalks $ 1181000 $ 1161000 $ 12000 <br /> Street Lighting $ 15700 $ 1551000 $ 15900 <br /> Storm Sewer $ 10200 $ 6600 $ 681000 <br /> Trunk Storm Sewer $ 1121000 $ 0 $ 81,000 <br /> Watermain $ 1691000 $ 13600 $ 14000 <br /> Sanitary Sewer $ 92,000 $ 88,000 $ 91,000 <br /> Total Costs $ 1,1691000 $ 97300 $ 10500 <br /> Prepared by:Bolton&Menk,Inc. COST ANALYSIS <br /> The COR Analysis I OR1.129128 Page 14 <br />