My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/13/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 02/13/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:08:07 AM
Creation date
2/14/2024 1:04:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veterans Drive Peridot Street <br /> Improvement Segment H Segment I <br /> Roadway $ 7631000 $ 3601000 <br /> Trails/Sidewalks $ 25400 $ 12000 <br /> Street Lighting $ 3391000 $ 15900 <br /> Storm Sewer $ 1201000 $ 41,000 <br /> Watermain $ 2451000 $ 14300 <br /> Sanitary Sewer $ 0 $ 94,000 <br /> Total Costs $ 117211000 $ 9171000 <br /> Segments D-1, D-2, D-3 and D-4 include sidewalks and miscellaneous street scape improvements <br /> along Sunwood Drive. The Segments, and associated costs, are presented in the following table. <br /> Segment Location Estimated Cost <br /> D-1 Center Street to Sapphire Street $ 13400 <br /> D-2 Willemite Street to Center Street $ 201 NO <br /> D-3 Yolite Street to Willemite Street $ 2301000 <br /> D-4 Zeolite Street to Yolite Street $ 237,000 <br /> Total $ 80200 <br /> The above costs are considered project costs and include 3 0% contingencies and project development <br /> costs. Project development costs include administrative, engineering, and fiscal related costs. <br /> Summary of Costs <br /> The total for the roadway,trail, sidewalk, and street lighting improvements is estimated at$8,794,000. <br /> The total for sanitary sewer and water main extension improvements is estimated at$1,818,000. <br /> The total trunk related improvements for sanitary sewer and storm sewer is estimated at$513,000. <br /> The total landscaping improvements along Sunwood Drive from Zeolite Street to Sapphire Street is <br /> estimated at$802,000. <br /> The total for regional stormwater retention pond excavation, grading, and impervious liner is estimated at <br /> $2,980,000. Tree removal and preservation associated with the regional pond area is estimated at <br /> $1609000. <br /> The total for mass site grading of the remaining undeveloped land within The COR, including wetland <br /> mitigation is estimated at$3,002,000. Tree removal and preservation associated with the undeveloped <br /> area is estimated at$794,000. <br /> The total for The Waterfront,Phase 1 is estimated at$4,218,000.The Waterfront's park features are still <br /> considered preliminary. Costs and improvements are based on 2018 City Cost Estimating effort, adjusted <br /> for 2023 pricing and include a recreational splash pad,wading fountain,vehicle access,parking, <br /> associated concrete walkways, a bituminous trail circumnavigating the stormwater feature, and <br /> miscellaneous landscaping. The proposed community buildings,pergola, and future phases are not <br /> included in these estimates. <br /> Prepared by:Bolton&Menk,Inc. COST ANALYSIS <br /> The COR Analysis I OR1.129128 Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.