My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:10:20 AM
Creation date
3/8/2024 12:02:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I� <br /> nE <br /> www.ae2s.coni <br /> Proposal No. 014(RFP 008): Jet Mixing System Pump Modifications: <br /> The backwash tank jet mixing system pump substitution approved with Construction Contingency Expense <br /> No. 1 for a$25,000(see attached)ultimately did not fit within the current arrangement of the WTP.Looking <br /> at other options, it was decided that we will need to go back to a similar arrangement as in the original <br /> design. After working with the supplier we agreed on a $15,000 pump option, so that the City could still <br /> maintain $10,000 of the original $25,000 deduct. This change will be more beneficial to the operators and <br /> work as intended within the original design. <br /> Proposal No. 015: Door Hardware Modifications: <br /> During submittal review,the door hardware supplier required updates to the door hardware specification to <br /> ensure that the hardware being supplied is up to date. As an update, Field Order No. 04 was submitted to <br /> update the hardware specification and Sheet A804. The proposal reflects the door hardware supplier's <br /> associated costs for supplying better quality hardware,per the updated specification. <br /> Proposal No. 016: Access and Door Hardware Coordination Changes: <br /> As a result of the December 7 door hardware and access control meeting, the architect issued Field Order <br /> No.04(see attached)for the required updates.The proposal reflects the door hardware supplier's associated <br /> costs for these modifications. <br /> Summary of General Construction Continency Costs: <br /> AE2S has summarized all known construction contingency expenses at this time in order to help the City <br /> of Ramsey better understand the current contingency status. As Construction progresses, AE2S will <br /> continue to provide cost updates and coordinate with City staff. <br /> Original General Construction Contingency Amount <br /> $ 95000.00 <br /> Expense No. 1 $761446.53 <br /> Expense No. 2 $1351654.02 <br /> Expense No. 3 $991095.63 <br /> Net Expenses to Date: $3119196.18 <br /> Available Construction Contingency= $6389803.82 <br /> In summary, AE2S continues to support and track the progress of the WTP and will provide updates as <br /> necessary for the City to make responsible decisions on the progress of the WTP. This document is being <br /> submitted as Construction Contingency Expense No. 3 for the City to formally consider and take action on. <br /> Should you have any further questions please do not hesitate to contact me at my e-mail <br /> Ryan.Hanson@ae2s.com or on my cell phone at 612-220-0154. <br /> Submitted in Service, <br /> AE2S <br /> Ryan Hanson <br /> Construction Lead <br /> Advanced Engineering and Environmental Services, Inc. <br /> 6901 East Fish Lake Road,Suite 184 • Water Tower Place Business Center • Maple Grove, MN 55369 • 763-463-5036 <br />
The URL can be used to link to this page
Your browser does not support the video tag.