My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:10:20 AM
Creation date
3/8/2024 12:02:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. 4. <br /> CC Regular Session <br /> Meeting Date: 03/12/2024 <br /> Primary Strategic Plan Initiative: Address infrastructure needs. <br /> Information <br /> Title: <br /> Adopt Resolution#24-069 Accepting Bids and Awarding Contract for 2024 Crack Seal Improvements, <br /> Improvement Project#24-08 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#24-069 accepting bids and awarding contract for 2024 Crack <br /> Seal Improvements, Improvement Project#24-08. <br /> Background: <br /> Crack seal improvements are completed annually on between 10 and 23 miles of public street segments to <br /> cost-effectively maximize the life of the bituminous pavement. <br /> Crack sealing protects pavement by preventing stormwater runoff from seeping through cracks in the pavement <br /> and joints between the pavement and concrete curb and gutter, and utility castings. Reducing future pavement <br /> damage due to wet subgrade soils, especially during freeze-thaw cycles. <br /> The City's current pavement maintenance schedule calls for public streets to be crack sealed the third, seventh, <br /> and fourteenth years following construction,reconstruction, and overlay improvements. However,while this is <br /> the typical maintenance schedule, it is important to note that Staff reviews the condition of all streets annually and <br /> adjusts the schedule of maintenance operations based on actual pavement conditions. <br /> A total of 13.32 miles of public street segments are proposed to receive crack seal improvements in 2024. These <br /> street segments were selected based on age,pavement maintenance history, and Pavement and Surface Evaluation <br /> Rating (PASER)values. Selected streets generally have PASER values between 7 and 10. <br /> Plans and specifications for the 2024 Crack Sealing Improvements were prepared in-house as part of Staff's <br /> normal duties. A copy of the plans is attached to this case. <br /> Preliminary Schedule Remaining <br /> •Council awards contract to the lowest responsible bidder <br /> o March 12, 2024 <br /> •Contractor begins improvements <br /> o Late April/early May 2024 <br /> •Contractor completes improvements <br /> o May 31, 2024 <br /> Pro]ect Coordination <br /> Outside of pothole patching,major street maintenance in 2024 includes crack sealing,pavement rejuvenation, and <br /> pavement striping. Pavement striping generally occurs on MSA streets. Staff are aware of several street segments <br /> proposed to be within both the crack seal and the pavement rejuvenation projects, similar to 2023. Because of this, <br /> Staff is generally proposing to schedule pavement maintenance projects as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.