My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/2024
Ramsey
>
Public
>
Agendas
>
Council
>
2024
>
Agenda - Council - 03/12/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:10:20 AM
Creation date
3/8/2024 12:02:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Funding for this improvement is proposed to come from Pavement Management Funds, Stormwater Utility Funds, <br /> Sanitary Sewer Utility Funds, and 2024 General Levy Budgeted Trail Funds. <br /> Bids were advertised in the Anoka Union Herald on January 26 and February 2, 2024. On March 4, 2024 a total <br /> of six(6)bids were received, opened, and tabulated, and the following bids were found to comply with the <br /> advertisement for bids. <br /> Contractor Base Bid Alt Bid (Trail) Total Bid <br /> North Valley, Inc. $3501264.27 $621108.82 $4121370.09 <br /> Knife River Corporation $362,122.66 $621773.00 $4241895.66 <br /> Asphalt Surface Technologies $368 374.62 $82 087.20 $450 461.82 <br /> Corporation ' <br /> Valley Paving, Inc. $393,780.20 1$65,748.00 $459,528.20 <br /> Park Construction Company $424,918.05 $701950.30 E$495,868.35 <br /> Landall Services, L.L.C. $457,356.50 $76,867.40 4,223.90 <br /> Engineer's Estimate $421,074.00 $82,205.00 $503,279.00 <br /> The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of$412,370.09 for the total bid for said <br /> improvements in accordance with the approved plans and specifications and advertisement for bids, is the lowest <br /> responsible bidder. <br /> Adding indirect costs in the amount of 23-percent,brings the total project costs to $507,215.21. <br /> The low bid is 18-percent less than the engineer's estimate,primarily due to lower than anticipated bituminous <br /> and mobilization costs. <br /> Funding source breakdown: <br /> Funding Source Construction Costs Indirect Costs Total Costs <br /> Pavement Management Funds $3081210.68 $701888.46 $379,099.14 <br /> Storm Sewer Utility Funds $251023.13 $51755.32 $301778.45 <br /> Sanitary Sewer Utility Funds $141027.83 $31226.40 $171254.24 <br /> 2024 General Levy Budgeted <br /> $65,108.44 $141974.94 $801083.38 <br /> Trail Funds <br /> Project Totals F$4129370.09 1$949845.12 1$5079215.21 <br /> Bolton&Menk submitted a proposal for construction staking and as-built survey of the proposed improvements <br /> for a total not-to-exceed amount of$12,024.00. The construction staking and as-built survey are included in the <br /> indirect project costs. <br /> City Staff proposes to administer and inspect construction. Plans and specifications were prepared in-house as <br /> part of Staff s normal duties. <br /> Recommendation: <br /> Staff recommends Alternative#1. <br /> Outcome/Action: <br /> Motion to adopt Resolution#24-070 accepting bids and awarding a contract for Juniper woods 1 st—3 rd Street <br /> Reconstructions, Improvement Project#24-12, to North Valley, Inc. for the total bid in the amount of <br /> $412,370.09. <br />
The URL can be used to link to this page
Your browser does not support the video tag.