My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:23 AM
Creation date
3/18/2024 8:52:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 2. <br /> Public Works Committee <br /> Meeting Date: 03/19/2024 <br /> Primary Strategic Plan Initiative: Promote economic growth and development. <br /> iii Title: <br /> Consider Recommendation for City Council to Accept Bids and Award Contract for Improvement Project <br /> #23-19, COR Infrastructure Improvements <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to consider a recommendation for City Council to accept bids and award a contract <br /> for construction for Improvement Project#23-19, COR Infrastructure Improvements. <br /> Background: <br /> On February 21, 2023,the Public Works Committee(PWC)reviewed The COR Analysis Update as prepared by <br /> Bolton and Menk,Inc. and identified the following immediate COR Infrastructure priorities; <br /> •Grading, lining and installing storm sewer for the Waterfront stormwater pond, <br /> •Filling low-lying COR properties using fill from the Waterfront pond excavation, <br /> •Reconstructing Zeolite Street, <br /> •Reconstructing and realigning the north end of Center Street, and <br /> •Constructing Ramsey Parkway between the Sunwood Drive roundabout and Willemite Street. <br /> Attached is a copy of The COR Analysis Update. <br /> During the February 28,2023, City Council work session, Council confirmed these priorities by consensus. <br /> Based on these identified priorities,Bolton and Menk,Inc. prepared the attached COR Infrastructure Design <br /> Services Proposal to identify the associated scope of services and estimated costs required for design services, as <br /> well as estimated construction costs. Per the attached proposal, completing the following work tasks in 2023 <br /> would help to achieve the identified priorities; <br /> •Grading, lining and installing storm sewer for the Waterfront stormwater pond, <br /> •Filling low-lying COR properties using fill from the Waterfront pond excavation, <br /> •Design and prepare plans and specifications for Zeolite Street, <br /> •Design and prepare plans and specifications for the north end of Center Street, and <br /> •Design and prepare plans and specifications for Ramsey Parkway between the Sunwood Drive roundabout <br /> and Willemite Street. <br /> In the Summer of 2023, all trees were cleared from The COR allowing it to be mass graded. This work was <br /> designated as Improvement Project#23-17, COR Tree Clearing. <br /> In the Fall of 2023,the Waterfront pond was graded and lined, all low-lying parcels in The COR were filled to <br /> specified elevations using structural fill material excavated from the pond after documenting and compacting all <br /> underlying soils, salvaged topsoil was spread on the newly placed and compacted fill, and turf was established. <br /> This work was designated as Improvement Project#23-20, COR Mass Grading. <br /> At the December 12, 2023 City Council work session, the City Council directed staff to work with Bolton and <br /> Menk to prepare final plans and specifications for Improvement Project#23-19, COR Infrastructure <br /> Improvements,with the intent of constructing the improvements in 2024. The proposed improvements include <br /> reconstructing Zeolite Street between Sunwood Drive and Bunker Lake Boulevard, constructing Ramsey Parkway <br /> between Willemite Street and the roundabout at the intersection of Sunwood Drive and 147th Avenue, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.