Laserfiche WebLink
Mr. Bruce Westby, P.E. <br /> April 7, 2023 <br /> Page 2 of 5 <br /> • The construction of the regional storm water retention pond will allow for complete <br /> development of The COR.This construction will then allow for construction of The Waterfront <br /> amenity, and <br /> • The material generated from the regional storm water retention pond can be used as fill for the <br /> remaining undeveloped portion of The COR.This should serve to lower development costs, <br /> making the area more attractive to potential businesses. <br /> CONSTRUCTION COST ESTIMATES <br /> The COR report update, completed in 2023, presented project costs associated with the street and <br /> public utility related improvements.Those amounts were based on 2023 construction costs, and <br /> included a 30 percent allowance for contingencies and project development. Project costs were also <br /> included in The COR report for the regional storm water retention pond, mass grading, tree <br /> preservation, and park amenities. <br /> Based on The COR analysis,the following construction cost estimates, including a 10%contingency, <br /> were considered when preparing our fee estimate: <br /> Ramsey Zeolite Center <br /> Improvement Parkway Street Street TOTAL <br /> Roadway $1.259,100 $709,100 $555,900 $2,524.100 <br /> Parking $0 $0 $158,400 $158.400 <br /> Trails/Sidewalks $249,600 $199,700 $166,700 $616,000 <br /> Storm Sewer $675,200 $113,400 $145,500 $934,100 <br /> Trunk Storm Sewer $22,000 $68,500 $0 $90,500 <br /> Watermain $354,500 $233,500 $0 $588.000 <br /> Sanitary Sewer $170,100 $151,500 $0 $321,600 <br /> Trunk Sanitary Sewer $248,800 $0 $0 $248.800 <br /> Total Costs $2,979,300 $1,475,700 $1,026,500 $5,481,500 <br /> Construction costs associated with the regional storm water retention pond include the following: <br /> dewatering, muck excavation, wetland mitigation, clay liner, and rough grading of the storm water pond <br /> area. Additionally, material will be placed on adjacent lots within The COR area and compacted to allow <br /> for building pads. Construction costs associated with these items are estimated at$5,066,800. <br /> Tree removal and preservation construction costs are estimated at$135,400 within the regional pond <br /> area and at$671,800 for the remaining areas. <br /> Total estimated construction costs for the described improvements are estimated at$11,355,500. <br /> SCOPE OF SERVICES <br /> PRELIMINARY DESIGN <br /> Prior to initiating design, we will meet with the City to discuss the initial project scope. Items to discuss <br /> include: <br /> • Topographic Survey of The COR, <br /> • Geotechnical and Environment Evaluations, <br /> C:\Users\kevinki\Desktop\C0R Design 2023\New folder\Ramsey CDR Area Design 04072023.docx <br /> B (tori 3,Mon I( n can rsrq ua[oC,portumty omployer. <br />