My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:23 AM
Creation date
3/18/2024 8:52:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bruce Westby, P.E. <br /> April 7, 2023 <br /> Page 3 of 5 <br /> • Extents of improvements, <br /> • Tree removals, <br /> • Excavations, stockpiles, and Lot grading, <br /> • Wetland impact strategy, <br /> • Waterfront configuration, <br /> • Roadway layouts, alignments, and grades, <br /> • Stormwater strategies, and <br /> • Other key issues. <br /> To date,we have completed several topographical surveys. We will augment our current data with <br /> additional data to compile a full comprehensive base map.The attached exhibit displays our topographic <br /> survey strategy. <br /> We will then create a base layout showing the improvements and schedule a second meeting with the <br /> City.A final layout will be prepared to show the improvements prior to beginning final design on any <br /> one component. <br /> We have anticipated additional meetings and communications will be required as we work through the <br /> preliminary design process.This time has been included for the task. <br /> Once final layouts are determined we will begin the right-of-way vacation and plat process.The <br /> evolution of The COR area has led to Ramsey Parkway and Center Street rights-of-way likely being <br /> obsolete.The final parcel and road layout will require vacation and re-platting.The proposed plat will <br /> allow the City to convey available land for development. <br /> Geotechnical and Environmental Services <br /> We are proposing to augment our design team with Braun Intertec (Braun). Braun will complete <br /> geotechnical exploration and review for roadway construction and assist in analyzing the <br /> excavation and fill placement of the material located in the regional storm water retention <br /> pond. <br /> Generally, Braun's services will include the following: <br /> • Ramsey Parkway—Seven borings and pavement design, <br /> • Zeolite Street—Four borings and pavement design, <br /> • Center Street—Three borings and pavement design, and <br /> • Regional Storm Water Retention Pond & Mass Grading—55 borings in addition to the 9 <br /> borings that already exist within The COR.Assistance with planning for the mass grading <br /> of The COR. Environmental testing of materials located in low areas, or other potentially <br /> contaminated areas. <br /> • Complete a Phase I Environmental Service Assessment (ESA) <br /> Continued assistance during the construction phase will allow Braun to also assist with <br /> preparation of documents related to the individual sites within The COR that the City can <br /> provide to potential developers.The documents will indicate material type, bearing capacity, <br /> allowable loads, and foundation recommendations. <br /> The attached Fee Proposal spreadsheets detail the hours and staff associated with preliminary design. <br /> C:\Users\kevinki\Desktop\C0R Design 2023\New folder\Ramsey CDR Area Design 04072023.docx <br /> B (tori 3,Mon I( n can rsrq ua[oC,portumty omployer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.