My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/19/2024
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2024
>
Agenda - Public Works Committee - 03/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:46:23 AM
Creation date
3/18/2024 8:52:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bruce Westby, P.E. <br /> April 7, 2023 <br /> Page 4 of 5 <br /> FINAL DESIGN <br /> Our scope of services will vary, depending upon the selected improvements. For each of the three <br /> roadway related projects, our services are anticipated to include: <br /> • Final Roadway Plans, <br /> • Public Utility Plans (Sanitary Sewer and Watermain), <br /> • Specifications, <br /> • Permitting, and <br /> • Bidding Services. <br /> For the regional stormwater retention pond, our scope of services is anticipated to include the <br /> following: <br /> • Create based map of the pond area and proposed stockpile areas. <br /> • Perform a detailed material analysis for mass grading of the area.We will utilize Braun Intertec <br /> as a sub-consultant for this work. <br /> • Prepare pond and stockpile mass grading plans. Lots will be graded to within 0.5 feet of <br /> proposed finished floor elevation (FFE). Minimum HE is required to 2 feet above the 100-year <br /> highwater elevation of the regional pond. <br /> • Prepare a detailed grading(or fine grading) plan for the regional stormwater retention pond <br /> area and impervious clay liner. <br /> • Prepare restoration and tree preservation plans for the entire area. <br /> • We'll also prepare project specifications, complete the permitting required, administer the <br /> bidding process. <br /> The work associated with The COR is anticipated to require the following permits prior to construction: <br /> • Lower Rum River Watershed Management Organization (Stormwater,Wetlands, and Erosion <br /> Control), and <br /> • MPCA(NPDES—Construction Stormwater General Permit). <br /> • MPCA& MCES—Sanitary Sewer Extension <br /> • MDH—Watermain Construction <br /> • Anoka County(General Work in Right-of-Way Permit CSAH 116) <br /> • Wetland Conservation Replacement Plans <br /> SUMMARY OF FEES <br /> We have prepared fee estimates based on our understanding of the work to be performed. Preliminary <br /> design will involve a comprehensive overall review in of The COR and Final Design breakdowns are <br /> shown as if each segment is constructed individually. <br /> We estimate the Civil related design fees will be as presented below: <br /> Preliminary Design Tasks Fees <br /> Project Meetings& Coordination $5,860 <br /> Topographical Services $21,684 <br /> Geotechnical and Environmental $73,675 <br /> C:\Users\kevinki\Desktop\C0R Design 2023\New folder\Ramsey CDR Area Design 04072023.docx <br /> B (tori 3,Mon I( n can rsrq ua[oC,portumty omployer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.