Laserfiche WebLink
Mr. Bruce Westby, P.E. <br /> April 7, 2023 <br /> Page 5 of 5 <br /> Tree Preservation & Removals $3,740 <br /> Roadway Layout, Alignment, and Grades $13,592 <br /> Waterfront Configuration $12,556 <br /> Wetland Impacts $5,454 <br /> Lot Grading $5,320 <br /> Stormwater Analysis & Strategy $11,830 <br /> Right-of-Way Vacation & Platting $21,876 <br /> Not-To-Exceed Fees $175,587 <br /> Final Design Fees <br /> Ramsey Parkway $116,816 <br /> Zeolite Street $56,562 <br /> Center Street $41,420 <br /> Regional Stormwater Pond & Mass Grading $157,796 <br /> Not-To-Exceed Fees $372,594 <br /> The fees in the above tables, and included on the attached spreadsheets, represent not-to-exceed costs <br /> if the projects are designed and constructed as individual projects. If two or more of the projects are <br /> combined, savings would be realized for items such as specifications, bidding services, permitting and a <br /> portion of the plan design. <br /> Construction-related services such as staking, administration and observation are not included in this <br /> proposal.A separate proposal can be submitted once the extent and timing of the improvements is <br /> finalized. <br /> If there are any questions or concerns, please call me at (651) 968-7760. <br /> Sincerely, <br /> Bolton& Menk, Inc. <br /> Kevin P. Kielb, P.E. <br /> Principal Engineer <br /> Attachments: <br /> Figure 1—The COR Improvements <br /> Figure 2—Topographic Survey Services <br /> Figure 3—Stormwater Regional Pond and Mass Grading <br /> Fee Spreadsheets <br /> Braun Intertec Proposal for Geotechnical and Phase 1 ESA <br /> C:\Users\kevinki\Desktop\COR Design 2023\New folder\Ramsey CDR Area Design 04072023.docx <br /> B (tori 3,Mon I( n can rsrq ua[oC,portumty omployer. <br />